Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 165 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />HVSP FEIR. Additionally, the proposed project would implement mitigation measures E1 and E3 as <br />conditions of approval, as previously discussed. As a result, the proposed project would not require <br />the construction of new water facilities and would not result in impacts related to potable water <br />supply beyond those previously analyzed in the 1998 HVSP FEIR. <br />c) Wastewater Treatment Capacity <br />Would the project: Result in a determination by the wastewater treatment provider which serves or <br />may serve the project that it has adequate capacity to serve the project’s <br />projected demand in addition to the provider’s existing commitments? <br />The 1998 HVSP FEIR determined that the additional flows generated by the project could contribute <br />to a possible future shortfall of treatment capacity at the DSRSD Wastewater Treatment Plant <br />(WWTP). According to Table 22, Pleasanton currently has 0.685 MGD of treatment capacity available <br />at the DSRSD plant after existing flows and legally committed reserves. Wastewater generated by <br />development permitted by the HVSP (approximately 0.80 MGD, estimated based on the mitigated <br />generation rates) would reduce remaining capacity to about 0.605 MGD, and when non-legally <br />committed reserves are included, Pleasanton has 0.445 MGD of remaining treatment capacity <br />available. Development permitted by the HVSP would reduce remaining capacity to about 0.365 <br />MGD.54 The impact of increased wastewater flows was not considered a significant project-level <br />impact but was considered a potentially cumulative impact. <br />The 1998 HVSP FEIR determined that potential cumulative impacts related to wastewater treatment <br />capacity and wastewater export capacity may occur. Increase in wastewater flows generated by the <br />project site, in conjunction with wastewater flows generated by other Pleasanton projects, would <br />contribute to the DSRSD's need to expand treatment capacity at the WWTP. The wastewater export <br />demand of the Specific Plan project, together with demand generated by other future development, <br />would contribute to an impending shortfall of Pleasanton's export capacity in the LAVWMA pipeline <br />and to LAVWMA's anticipated need to expand pipeline capacity. <br />This project would result in a significant impact if the wastewater treatment provider would not be <br />able to serve the project with adequate capacity. Wastewater generated in Pleasanton is treated at <br />the DSRSD’s RWTF. Owned and operated by the DSRSD, this plant has an average daily dry weather <br />flow of 17 MGD. As discussed previously, the City of Pleasanton is entitled to half this treatment <br />capacity, or 8.5 MGD. The City’s average annual wastewater flow is approximately 6.0 MGD, which <br />leaves 2.5 MGD of remaining capacity. This remaining capacity is sufficient to serve Pleasanton’s <br />planned buildout growth as anticipated in the General Plan. The proposed project would generate an <br />estimated 6,099 GPD of wastewater as calculated previously. As such, this project’s wastewater <br />generation represents 0.15 percent of the remaining 2.5 MGD capacity. Further, as described <br />previously, the proposed project is consistent with General Plan and HVSP buildout projections, and, <br />therefore, the wastewater treatment needs of the proposed project have been accounted for in <br />long-range planning efforts. There is sufficient capacity to serve the project’s projected demand in <br />addition to existing commitments. Therefore, the proposed project would not require the <br /> <br />54 City of Pleasanton. 1998. Draft Environmental Impact Report, Happy Valley Specific Plan, Table 22, Wastewater Treatment Capacity <br />Demand and Supply Relationships (MGD).