Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />168 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />FEIR Mitigation Measures <br />MM E1 Water conservation devices and drought-tolerant landscaping shall be installed, and <br />water reclamation measures shall be taken to the fullest extent feasible. <br />Timing: Plans to demonstrate conformance prior to issuance of building permits. <br />MM E3 Site selection, grading, landscape screening, and other suitable treatment to <br />minimize the visibility of water tanks and pump stations are government by site <br />development standards incorporated in the Specific Plan. <br />Timing: Confirm that standards are met prior to finalization of construction <br />specifications for the water and sewer systems. <br />MM F New sewer lines installed in the Happy Valley Specific Plan Area must be of a material <br />that minimizes or eliminates infiltration and inflow to those lines. <br />Timing: Material selection prior to finalization of construction specifications for the <br />sewer system. <br />MM G1 Design and construction of the project must comply with the Alameda Countywide <br />Clean Water Program requirements for Best Management Practices to control non-point <br />source runoff pollutants. <br />Timing: Prior to approval of grading plans for the Golf Course and all residential <br />development projects in the Specific Plan Area. <br />MM G4 Along Alisal Street, cleaning of culverts and minor grading to improve existing drainage <br />conditions, and replacement of private driveway culverts at the corrected grade at <br />several locations along the street is required. <br />Timing: At construction of the water and sewer systems; then on an as-needed basis. <br />MM G5 The developer of the Spotorno Flat Area is required to replace crossroad drain lines with <br />properly sized culverts, improve site drainage by constructing an earthen vee ditch with <br />consistent fall (or other comparable improvement), and construct storm water detention <br />facilities on the Spotorno Flat Area. <br />Timing: Prior to acceptance of public improvements in the Spotorno Flat Area. <br />Conclusion <br />No new significant impacts to water, wastewater, and stormwater facilities would occur. The <br />conclusions from the 1998 HVSP FEIR remain unchanged.