My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />168 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />FEIR Mitigation Measures <br />MM E1 Water conservation devices and drought-tolerant landscaping shall be installed, and <br />water reclamation measures shall be taken to the fullest extent feasible. <br />Timing: Plans to demonstrate conformance prior to issuance of building permits. <br />MM E3 Site selection, grading, landscape screening, and other suitable treatment to <br />minimize the visibility of water tanks and pump stations are government by site <br />development standards incorporated in the Specific Plan. <br />Timing: Confirm that standards are met prior to finalization of construction <br />specifications for the water and sewer systems. <br />MM F New sewer lines installed in the Happy Valley Specific Plan Area must be of a material <br />that minimizes or eliminates infiltration and inflow to those lines. <br />Timing: Material selection prior to finalization of construction specifications for the <br />sewer system. <br />MM G1 Design and construction of the project must comply with the Alameda Countywide <br />Clean Water Program requirements for Best Management Practices to control non-point <br />source runoff pollutants. <br />Timing: Prior to approval of grading plans for the Golf Course and all residential <br />development projects in the Specific Plan Area. <br />MM G4 Along Alisal Street, cleaning of culverts and minor grading to improve existing drainage <br />conditions, and replacement of private driveway culverts at the corrected grade at <br />several locations along the street is required. <br />Timing: At construction of the water and sewer systems; then on an as-needed basis. <br />MM G5 The developer of the Spotorno Flat Area is required to replace crossroad drain lines with <br />properly sized culverts, improve site drainage by constructing an earthen vee ditch with <br />consistent fall (or other comparable improvement), and construct storm water detention <br />facilities on the Spotorno Flat Area. <br />Timing: Prior to acceptance of public improvements in the Spotorno Flat Area. <br />Conclusion <br />No new significant impacts to water, wastewater, and stormwater facilities would occur. The <br />conclusions from the 1998 HVSP FEIR remain unchanged.
The URL can be used to link to this page
Your browser does not support the video tag.