Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 169 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Environmental Issues <br />CEQA Section 15183(b) Criteria <br />Prior 1998 <br />HVSP FEIR <br />Determination <br />Effect <br />Peculiar to <br />Project or <br />Site? <br />New <br />Significant <br />Effect? <br />New <br />Significant <br />Off-site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? <br />4.19 Wildfire <br />If located in or near State Responsibility Areas or lands classified as very high fire hazard severity zones, <br />would the project: <br />a) Substantially impair an adopted emergency <br />response plan or emergency evacuation <br />plan? <br />None No No No No <br />b) Due to slope, prevailing winds, and other <br />factors, exacerbate wildfire risks, and <br />thereby expose project occupants to, <br />pollutant concentrations from a wildfire or <br />the uncontrolled spread of a wildfire? <br />None No No No No <br />c) Require the installation or maintenance of <br />associated infrastructure (such as roads, <br />fuel breaks, emergency water sources, <br />power lines or other utilities) that may <br />exacerbate fire risk or that may result in <br />temporary or ongoing impacts to the <br />environment? <br />None No No No No <br />d) Expose people or structures to significant <br />risks, including downslope or downstream <br />flooding or landslides, as a result of runoff, <br />post-fire slope instability, or drainage <br />changes? <br />None No No No No <br /> <br />a) Emergency Response/Evacuation Plan Consistency <br />Would the project: If located in or near State Responsibility Areas or lands classified as very high fire <br />hazard severity zones, substantially impair an adopted emergency response plan <br />or emergency evacuation plan? <br />This impact question was not included in the 1998 HVSP FEIR. Therefore, no determination was <br />made in the 1998 HVSP FEIR regarding the significance level for impacts related to consistency with <br />an emergency response plan or emergency evacuation plan within an SRA or very high fire hazard <br />severity zone. The 1998 HVSP FEIR determined that development according to the HVSP would <br />contribute to demands for fire protection that would eventually expose additional portions of the <br />fire service area to risk in the form of response times exceeding 5 minutes; this impact was discussed <br />in Section 4.16, Public Services.