Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 171 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />General Plan Program 10.1. The proposed project would comply with the Building Code and <br />Subdivision Ordinance and would be reviewed by City departments as required. <br />Therefore, the proposed project would not result in any peculiar effects and would not result in new <br />or more severe impacts related to an emergency response plan or emergency evacuation plan <br />beyond what was previously analyzed in the 1998 HVSP FEIR. <br />b) Expose Project Occupants to Pollutant Concentrations from Wildfire <br />Would the project: If located in or near State Responsibility Areas or lands classified as very high fire <br />hazard severity zones, due to slope, prevailing winds, and other factors, <br />exacerbate wildfire risks, and thereby expose project occupants to, pollutant <br />concentrations from a wildfire or the uncontrolled spread of a wildfire? <br />This question was not included in the 1998 HVSP FEIR. No determination was made regarding the <br />significance level of impacts related to the project’s potential to expose occupants to pollutant <br />concentrations from wildfire. <br />The project site is within an SRA. Additionally, according to the General Plan Safety Element, the <br />Happy Valley Area is in a special fire protection area, defined as developments located outside the 5- <br />minute response time areas, and is designated as areas which contract with Pleasanton for Fire <br />Protection.65 As discussed in the previous question, the project would comply with the applicable <br />Building Code, Fire Code, the Subdivision Ordinance, the conditions of approval pursuant to the 1998 <br />HVSP FEIR, and with the requirements for the special fire protection area, which include providing <br />additional fire mitigation measures such as automatic fire sprinkler systems.66 Furthermore, the <br />proposed project would be designed in a manner consistent with California Building Standard Codes <br />and applicable provisions of the California Fire Code with regard to fire and emergency access and <br />types of building materials, and the proposed project would be reviewed by the Livermore- <br />Pleasanton Fire Department prior to approval. Therefore, impacts would be less than significant. The <br />proposed project would not result in any peculiar effects and would not result in new or more severe <br />impacts related to the project’s potential to expose occupants to pollutant concentrations from <br />wildfire beyond what was previously analyzed in the 1998 HVSP FEIR. <br /> <br />65 City of Pleasanton. 2013. Pleasanton General Plan 2005 – 2025 Public Safety Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23899. Accessed January 18, 2021. <br />66 Ibid.