My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of 2018 Spotorno Ranch Air Quality Analysis <br />March 22, 2021 <br />Page 3 <br /> <br />The proposed project would result in an increase of housing units over the existing allowable units for <br />the Spotorno Flat Area. However, the redesignation of the PUD-MDR designated portion of the Spotorno <br />Upper Valley Area to Open Space/Agriculture would result in a decrease of 75 units in the Spotorno <br />Upper Valley Area and would result in the buildout of 58 fewer homes than initially anticipated by the <br />HVSP. <br />As such, the proposed project would not result in a substantial unplanned increase in population, <br />employment, or regional growth in vehicle miles traveled. Therefore, emissions related to development <br />of the project site would have been included in growth forecasts for the current AQP as Low Density <br />Residential, Medium Density Residential, and Open Space—Public Health and Safety, and <br />implementation of the project would not result in substantial new regional emissions not foreseen in the <br />air quality management planning process. <br />Contribution to Air Quality Violations <br />A measure for determining if the project is consistent with the air quality plans is ensuring the project <br />would not result in an increase in the frequency or severity of existing air quality violations, cause or <br />contribute to new violations, or delay timely attainment of air quality standards or the interim emission <br />reductions specified in the air quality plans. This measure is determined by evaluating the project in view <br />of the regional and localized thresholds identified by the District for Regional and Local Air Pollutants, <br />which are used in this SEIR to evaluate Impacts AIR-2 through AIR-5. Buildout of the proposed project <br />would not be in violation with regional and localized thresholds after implementation of Mitigation <br />Measure (MM) AIR-2 and AIR-4, and therefore is consistent with Criterion 1 with incorporated <br />mitigation. <br />Criterion 2. Include Applicable AQP Control Measures <br />The 2017 Clean Air Plan (2017 CAP) aims to reduce air pollutants and greenhouse gases (GHGs) at the <br />local and regional level and includes a number of control measures to protect the climate and promote <br />mixed use, compact development to reduce vehicle emissions and human exposure to pollutants from <br />stationary and mobile sources. None of these stationary or mobile source control measures directly <br />apply to the proposed project, therefore, the proposed project would generally support the overall goals <br />of the CAP. However, it is expected that any future residents who would use transit would drive to transit <br />stations as continuous pedestrian connections are not provided to transit stops from the project site. <br />The project would be consistent with all applicable measures in the 2017 CAP including energy efficiency, <br />renewable energy, and urban heat island mitigation and shade tree planting. Therefore, the proposed <br />project would include applicable control measures from the 2017 CAP and is consistent with Criterion 2. <br />Criterion 3. Disrupt or Hinder Implementation of any AQP Control Measures <br />The project would not preclude extension of a transit line or bike path, propose excessive parking <br />beyond parking requirements, or otherwise create an impediment or disruption to implementation of <br />any AQP control measures. Because the project would not disrupt or hinder implementation of any AQP <br />control measures, the project is therefore consistent with Criterion 3.
The URL can be used to link to this page
Your browser does not support the video tag.