Laserfiche WebLink
57 <br /> Pre-construction surveys will be conducted to ensure that CTS are absent from the <br />construction area. If CTS are present, they should be relocated by a qualified biologist. <br /> The construction zone should be cleared, and silt fencing should be erected and <br />maintained around construction zones to prevent CTS from moving into these areas. <br /> A biological monitor will be present onsite during particular times of construction to <br />ensure no CTS are harmed, injured, or killed during project buildout. <br /> To minimize harm or mortality to individual CTS during migration movements, a <br />maximum speed limit of 10 mph for vehicle traffic on the project site during both <br />construction and operation phases will be enforced. <br />Additional avoidance and minimization measures to ensure that no individual CTS are harmed or <br />killed by the project are included in Appendix A. CTS is considered a focal species of the <br />EACCS and general and species-specific avoidance and minimization measures included in the <br />EACCS Biological Opinion which also will be implemented are included in Appendix B. <br />Compensation. The project description already includes the preservation of approximately 81 <br />acres of open space that will be preserved with a deed restriction, conservation easement, or <br />similar conservation mechanism which provides better quality potential estivation habitat for <br />CTS than the 28 to 30 acres of marginal estivation habitat that will be impact. These preserved <br />lands along with a Habitat Management Plan, would result in a less than significant impact for <br />loss of CTS upland habitat. A Habitat Management Plan will be developed for the preserved <br />land by a qualified biologist to benefit CTS and other grassland species that may occur there <br />such as the burrowing owl and American badger. Therefore, we believe the project as currently <br />proposed would result in a less than significant impact on upland habitat for CTS. <br />Regulatory issues. In addition to implementing avoidance, minimization and compensation measures <br />for CTS under CEQA, as described above, the applicant would need to comply with provisions of <br />the federal and state Endangered Species Acts and may need to seek take authorization from both <br />the USFWS and CDFW for project-related losses as required by law. To obtain a federal take <br />permit, consultation with the U.S. Fish and Wildlife Service may need to be initiated either <br />through a federal nexus (i.e., Section 7 consultation through the USACE) or through the HCP <br />process (i.e., Section 10 consultation).