My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
59 <br />To avoid impacts to active burrowing owl nests, a qualified biologist should conduct pre- <br />construction surveys for burrowing owls within the construction footprint and within 250 ft. of <br />the footprint no more than 30 days prior to the onset of ground disturbance. These surveys <br />should be conducted in a manner consistent with accepted burrowing owl survey protocols. If <br />pre-construction surveys determine that burrowing owls occupy the site during the non-breeding <br />season (September 1 through January 31), then a passive relocation effort (e.g., blocking burrows <br />with one-way doors and leaving them in place for a minimum of three days) may be necessary to <br />ensure that the owls are not harmed or injured during construction. Once it has been determined <br />that owls have vacated the site, the burrows can be collapsed, and ground disturbance can <br />proceed. If burrowing owls are detected within the construction footprint or immediately <br />adjacent lands (i.e., within 250 feet of the footprint) during the breeding season (February 1 <br />through August 31), a construction-free buffer of 250 ft. should be established around all active <br />owl nests. The buffer area should be enclosed with temporary fencing, and construction <br />equipment and workers should not enter the enclosed setback areas. Buffers should remain in <br />place for the duration of the breeding season or until it has been confirmed by a qualified <br />biologist that all chicks have fledged and are independent of their parents. After the breeding <br />season, passive relocation of any remaining owls may take place as described above. <br /> <br />3.3.5 Potential Impacts to Callippe Silverspot Butterflies <br />Potential Impact. A focused survey for the Callippe silverspot butterfly larval host plant, viola, <br />was conducted on the proposed development area, slope stabilization areas and a minimum 75- <br />foot buffer and none were detected. Further, these areas of the site do not support significant <br />populations of nectar plants for the butterfly. Therefore, habitat for this species is considered <br />absent from all areas that are proposed to be impacted by the project and the project is expected <br />to have no impact on this species or its habitat. <br />Mitigation. None required. <br />3.3.6 Disturbance to Nesting Raptors and Nesting Migratory Birds <br />Potential Impact. Although no trees occur within the areas that will be impacted by the project <br />or by slope stabilization activities, and therefore, the project would not be expected to result in <br />impacts to tree-nesting raptors or other tree-nesting birds, the grassland habitats of the site
The URL can be used to link to this page
Your browser does not support the video tag.