Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 97 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />proposed project would be located in the Spotorno Flat Area on western portion of the site. A <br />“Building Restriction Zone” would extend to 50 feet on both sides of the Verona Fault Area. The <br />building design would adhere to all applicable requirements from the California Building Standards <br />Code (CBC) at a minimum, as well as Pleasanton General Plan policies. Furthermore, consistent with <br />MM H7, a 2015 Geotechnical Feasibility Report was prepared for the project site by ENGEO, Inc. and <br />can be found in Appendix E. Therefore, the proposed project would not result in any peculiar effects <br />and would not result in new or more severe impacts related to fault rupture beyond what was <br />previously analyzed in the 1998 HVSP FEIR. <br />ii) Ground Shaking <br />The 1998 HVSP FEIR determined that ground shaking at the site during the expected earthquakes on <br />regional faults could cause structural and nonstructural damage to the proposed structures at the <br />project site. Structures and constructed slopes would be required to implement the most recent <br />Uniform Building Code (UBC), as well as requirements to prepare a soils report, consistent with MM <br />H1; disclosure of earthquake hazards to purchasers, consistent with MM H2; and preparation of an <br />earthquake preparedness and emergency response plan, consistent with MM H3. The 1998 HVSP <br />FEIR concluded that impacts related to seismic ground shaking were significant and unavoidable. <br />The project site is located is a seismically active region. Small earthquakes occur within the region <br />every year, and large earthquakes have occurred and are expected to occur in the future. Based on <br />the proximity of the project site to known active seismic sources, it should be expected that the <br />project site would experience moderately strong to strong seismic ground shaking during the <br />project’s lifetime. To mitigate the ground shaking effects, all structures would be designed using <br />sound engineering judgment and the latest CBC requirements, at a minimum. Additionally, <br />consistent with the 1998 HVSP FEIR, the proposed project would implement MM H1, which requires <br />preparation of a soil study; MM H2, which requires disclosure of earthquake hazards to purchasers; <br />and MM H3, which requires preparation of an earthquake preparedness and emergency response <br />plan. Therefore, the proposed project would not result in any peculiar effects and would not result in <br />new or more severe impacts related to ground shaking beyond what was previously analyzed in the <br />1998 HVSP FEIR. <br />iii) Ground Failure <br />As discussed in greater detail in the response to Checklist Question 4.7c, the 1998 HVSP FEIR <br />determined that moderate to strong ground shaking at the project site could result in liquefaction. <br />The alluvial deposits within Happy Valley are recognized in the City's General Plan as having a high <br />susceptibility to seismic shaking and "moderate to high" and "high" potential for liquefaction. <br />Therefore, the 1998 HVSP FEIR required implementation of a soils report and geotechnical report, <br />consistent with MM H1; disclosure of seismic hazards to purchasers, consistent with M2; and <br />preparation of an earthquake preparedness and emergency response plan, consistent with M3. The <br />1998 HVSP FEIR concluded that impacts related to seismic hazards, including liquefaction and ground <br />failure, were significant and unavoidable.