Laserfiche WebLink
Cities of Dublin and Pleasanton | Disaster Debris Management Plan | 2022 <br />119 <br /> <br />costs are provided throughout this RFP. <br />Technical Proposal <br />Proposers should, at a minimum, provide the following information in the order listed below: <br />a. Proposer background, with specific detail regarding work on similar projects performed in <br />excess of 200,000 cubic yards <br />b. Proposer technical experience regarding large-scale debris removal operations <br />associated with flooding, severe storms, tornadoes, wild fires, earthquakes, or other <br />natural or manmade disasters <br />c. Organizational chart including proposed points of contact and a full-time project manager <br />required to report to the City <br />d. Training (including FEMA courses/training) and professional experience (include all <br />professional certifications) of proposed staff <br />e. A list of existing contracts, particularly those within the State of California <br />f. References from existing contracts and/or past clients (must include references from the <br />successful completion of debris removal projects in excess of 200,000 cubic yards) within <br />the past 10 years <br />g. A list of Sub-Contractors, including primary operating location(s) <br />h. A one to two-page company profile with a brief description of the firm, capabilities, <br />experience, contact information, website, and additional resources <br />i. Detailed listing of Proposer’s equipment and resources highlighting equipment directly <br />owned by the proposer <br />j. A mobilization and operations plan <br />k. Construction drawings for Occupational Health and Safety Administration (OSHA)- <br />compliant temporary inspection towers <br />l. Anti-collusion statement <br />m. Proposer’s equipment and resource list – Proposers shall submit a list of on-site and off- <br />site equipment that will be available at the collection site or facility. The list should include <br />all fire prevention, safety, personal protective equipment (“PPE”), and other equipment <br />that the Proposer determines suitable or necessary for the project. <br />n. Spill and Fire Prevention Plan – Proposers shall submit spill prevention and fire prevention <br />plans tailored to on-site activities at the debris management site (“DMS”) or facility. <br />o. Contingency Plan – Proposers shall submit a format for a contingency plan and provide a <br />description of notification procedures to the participants of on-site emergencies and <br />evacuation of the participants in case of an emergency on site. <br />p. Employee Training Plan– Proposers shall submit a comprehensive training plan and <br />detailed training outline for each position involved in debris removal and DMS(s) <br />operations. Proposers should include copies of any training manuals. <br />q. Health and Safety Plan - Proposers shall submit information regarding their standard <br />health and safety plan. <br />r. Description of Proposer’s Safety Record – Proposers shall submit a listing of all warning <br />notifications, violations, and/or citations received from pertinent federal and/or state <br />agencies in the past three (3) years by the Proposer.