My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:36:33 PM
Creation date
6/2/2022 3:27:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Article 6. Other Related Services and Standards <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page 99 June 7, 2022March 8, 2018 <br />6.14.2 Payment and Billings Audit 3454 <br />The City shall have the right to conduct three (3) audits of Contractor’s Billings and payment of monies 3455 <br />due to the City during the Term to verify that Contractor has is accurately billing Customer, and has 3456 <br />calculated and transmitted all fees and payments as required by this Agreement. City intends to perform 3457 <br />such audits during Rate Period Three, Rate Period Five, and Rate Period Seven. Upon notice from City that 3458 <br />a payment and Billings audit will be conducted, Contractor shall provide all information requested by the 3459 <br />City and cooperate with the audit. Contractor shall be responsible for reimbursing the City for the cost of 3460 <br />each such audit, in an amount up to thirty-five thousand dollars ($35,000) per audit, which shall be a pass-3461 <br />through cost. 3462 <br />6.14.3 Service Level and Route Audit 3463 <br />A. General. Notwithstanding the provisions of Section 6.14.2, Contractor shall independently review 3464 <br />its Billings to Customers in accordance with this Section 6.14.3. The purpose of the review is to 3465 <br />determine that the amount which the Contractor is billing each Generator is consistent with the 3466 <br />City-approved Rate schedule in Exhibit G for the level of service (i.e., frequency of Collection, size 3467 <br />of Container(s), number of Containers, and location of Container(s)) provided to such Generator 3468 <br />by Contractor. 3469 <br />B. Procedures. Contractor shall review each Cart Service account at least once per year in such a 3470 <br />manner that all accounts on a particular route are audited on the same day. The audits shall be 3471 <br />scheduled so that Contractor completes audits of twenty-five percent (25%) of the Cart Service 3472 <br />routes each quarter. Contractor shall review each Bin Service account and Drop Box Service 3473 <br />account at least once every other year. Audits shall be scheduled in a manner that all accounts 3474 <br />on a particular route are audited on the same day and twelve and one half percent (12.5%) of the 3475 <br />Bin Service and Drop Box Service routes are audited each quarter. 3476 <br />The review shall be performed by the Contractor’s route supervisor(s) or other agent approved 3477 <br />by the City. The Person conducting the review shall compare a route report for the route under 3478 <br />review and verify, through visual inspection of each Customer’s Premises on the Customer’s 3479 <br />scheduled day of Collection, the level of service actually provided to each Customer listed on the 3480 <br />route report review and note the actual Service Level in writing on the route report. In addition, 3481 <br />the Contractor’s route supervisor or appropriate agent shall list any Customers receiving service 3482 <br />(and the level of such service) that do not appear on the routing report. The Contractor shall 3483 <br />reconcile the route report to the billing report, noting all discrepancies. Any discrepancies should 3484 <br />be marked clearly on the billing report. Contractor shall verify if the discrepancies result from 3485 <br />Customer’s request for special services on the day of the route audit and shall provide 3486 <br />documentation in such cases. Contractor shall issue correction notices to the Customers 3487 <br />correcting any billing inaccuracies within five (5) Business Days of the day the route audit was 3488 <br />performed and shall provide such notices to City along with the annotated billing report. 3489 <br />C. Route Audit Schedule. Thirty (30) calendar days prior to the Commencement Date, Contractor 3490 <br />shall submit a two (2)-year schedule for performing route audits, listing each route and calendar 3491 <br />quarter that each route will be audited. If the Contractor proposes to modify the two (2)-year 3492 <br />schedule during the Term, the Contractor shall submit a revised route audit schedule to the City 3493 <br />for approval. 3494
The URL can be used to link to this page
Your browser does not support the video tag.