My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:36:33 PM
Creation date
6/2/2022 3:27:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. For weekly routes with 1,500 to 3,999 Generators, <br /> Contractor shall sample a minimum of 30 Containers. <br /> C. For weekly routes with 4,000 to 6,999 Generators, <br /> Contractor shall sample a minimum of 35 Containers. <br /> d. For weekly routes with 7,000 or more Generators, Contractor <br /> shall sample a minimum of 40 Containers. <br /> The Containers shall be randomly selected prior to beginning the <br /> route review through use of a random number generator, or another <br /> method approved by the City. Upon City request, the Contractor <br /> shall prioritize inspections of Customers that are more likely to be <br /> out of compliance as identified by the Contractor, City, or the City's <br /> designee. <br /> 3. Contractor shall develop a specific route review methodology for <br /> the Container inspections, and such methodology shall comply with <br /> the minimum requirements of this Section and 14 CCR Section <br /> 18984.5(b). Contractor shall submit its proposed route review plan <br /> for the coming year to the City no later than January 15 of each <br /> year, which shall describe, at a minimum, Contractor's proposed <br /> methodology and schedule for performance of each route's annual <br /> review in accordance with the City's standards. If requested by the <br /> City, Contractor's proposed route review methodology shall include <br /> its plan for prioritizing the inspection of Customers that are more <br /> likely to be out of compliance, as identified by the Contractor, City, <br /> the City's designee, and/or CalRecycle. Contractor's methodology <br /> shall include its proposed process for identifying Prohibited <br /> Container Contaminants. The City, and/or its designee, such as <br /> StopWaste or CalRecycle, will review and approve the proposed <br /> methodology. Contractor may commence with the proposed <br /> methodology upon approval. Alternatively, the City reserves the <br /> right to develop the contamination minimization methodology, and <br /> Contractor shall use the City-developed methodology, provided that <br /> such methodology can be reasonably performed within two <br /> hundred (200) working hours. If the City's proposed methodology <br /> directs the Contractor to expend greater than two hundred (200) <br /> working hours to conduct the Route reviews, Contractor shall be <br /> entitled to compensation, in accordance with subsection A.5 below. <br /> 4. The City Contract Manager may request, and Contractor shall <br /> accept, modifications to the schedule to permit observation of the <br /> Route reviews by the City or its designee. In addition, Contractor <br /> shall provide an email notice to the City's Contract Manager no less <br /> than ten (10) business days prior to each scheduled Route review <br /> Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.