My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -2 B. SR 84/I-580 INTERCHANGE <br />TVTC PROJECT SPONSOR <br />City of Livermore <br />LEAD AGENCY <br />Caltrans, City of Livermore <br />PROJECT DESCRIPTION (UPDATED <br />SUMMARY 2021) <br />Project A-2b is located in Livermore, at <br />the intersection of I-580 and Isabel <br />Avenue including Portal Avenue. <br />The project consists of two phases: <br />• Phase 1 – The Isabel Avenue Interchange project which included replacing the I-580/Portola <br />Avenue interchange with the I-580/Isabel Avenue-SR 84 interchange. Phase I also included <br />realignment of Isabel Avenue and the realignment and extension of Portola Avenue from East <br />Airway Boulevard to Isabel Avenue. <br />• Phase 2 – The ultimate improvements at the I-580/Isabel Avenue-SR 84 Interchange are to provide <br />six lanes over I-580 at the Isabel Avenue-SR 84 Interchange and four lanes over I-580 at the Portola <br />Avenue overcrossing. <br />STATUS <br />A programmatic environmental assessment and right-of-way acquisition is complete. <br />Phase 1 <br />Construction of Phase I of the project was completed in March 2012. <br />Phase 2 <br />Conceptual design is approved. Project development activities are anticipated to begin in 2023. <br />PHASING AND SCHEDULE <br />The project is expected to be constructed in the following stages: <br />• Phase 1 – Completed and opened to traffic in March 2012. <br />• Phase 2 – Project development to begin in 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.