Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -9A. CROW CANYON ROAD IMPROVEMENTS PHASE 1 <br />TVTC PROJECT SPONSOR <br />Alameda County <br />LEAD AGENCY <br />Alameda County <br />PROJECT DESCRIPTION <br />(UPDATED SUMMARY 2021) <br />Project A-9a is located along Crow Canyon <br />Road between E. Castro Valley Boulevard <br />and the Alameda/Contra Costa County line. <br />Project A-9a is Phase 1 of a two-phase <br />safety improvement project along Crow <br />Canyon Road. Please refer to Project A-9b <br />for details on Phase 2. <br />Phase 1 safety improvements include speed <br />feedback signs, shoulder widening, <br />California Highway Patrol (CHP) <br />enforcement areas, and guard rail <br />modifications. <br />Overall, the short-term safety improvements will facilitate traffic safety and operations, while reducing <br />congestion for residents traveling between Alameda and Contra Costa Counties. <br />STATUS <br />The project is currently in the Preliminary Engineering/Environmental Studies stage. <br />PHASING AND SCHEDULE <br />Construction of Phase 1 is to be determined. <br />COST ESTIMATE AND FUNDING SOURCES <br /> <br />Cost (Millions) $18.87 <br />Funding (Millions) <br />CMA TIP $0.45 <br />Local Alameda County $0.45 <br />TVTDF $1.55 <br />Total Funding (Millions) $2.45 <br />Total Funding Shortfall (Millions) $8.42