My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -9B. CROW CANYON ROAD IMPROVEMENTS PHASE 2 <br />TVTC PROJECT SPONSOR <br />Alameda County <br />LEAD AGENCY <br />Alameda County <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project A-9b is located along Crow <br />Canyon Road between E. Castro Valley <br />Boulevard and the Alameda/Contra <br />Costa County Line. <br />Project A-9b is Phase 2 of the two-phase <br />safety improvement project along Crow <br />Canyon Road. Please refer to Project <br />A-9a for details on Phase 1. <br />Phase 2 safety improvements include <br />roadway realignment, shoulder widening, <br />roundabouts, two-way left turn lanes (as <br />needed), and tunnels at post mile (PM) <br />2.15. <br />This project will increase safety for motorists traveling along this major arterial roadway between Castro <br />Valley in Alameda County and San Ramon in Contra Costa County. The realignment of various curves, <br />shoulder widening, and tunnels at PM 2.15 will facilitate improved traffic operations and reduce <br />congestion for residents traveling between Alameda and Contra Costa Counties. <br />STATUS <br />This project is in the scoping stage. Construction is expected to begin after completion of Phase 1 <br />(Project A-9a). <br />PHASING AND SCHEDULE <br />Phasing and schedule have not yet been determined. <br />COST ESTIMATE AND FUNDING SOURCES <br /> <br />Cost (Millions) $58.77 <br />Funding (Millions) <br />TVTDF $1.69 <br />Total Funding (Millions) $1.69 <br />Total Funding Shortfall (Millions) $57.08
The URL can be used to link to this page
Your browser does not support the video tag.