My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br /> A -10A. VASCO ROAD SAFETY IMPROVEMENTS PHASE 1 <br />TVTC PROJECT SPONSOR <br />Alameda County <br />LEAD AGENCY <br />Alameda County <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project A-10a is located along <br />Vasco Road in Alameda County. <br />Project A-10a is Phase 1 of the <br />Vasco Road Safety <br />Improvements, a two-phase <br />safety improvement project along <br />Vasco Road. The project includes <br />roadway realignment, shoulder <br />widening, and installment of <br />median barriers along Vasco Road. Please refer to Project A-10b for details on Phase 2. <br />Roadway realignments have been completed and consisted of straightening the alignment of Vasco Road <br />at about 1.8-miles north of the Livermore city limits to the Alameda/Contra Costa county line. A median <br />barrier has been installed between the Contra Costa County line and about 1.8-miles north of the <br />Livermore city limits. The installation of median barriers eliminates crossover-type collisions that resulted <br />in fatalities in the past. The realignment of tight curves facilitates Tri Delta bus services between Alameda <br />and Contra Costa Counties. <br />The remaining components of Phase 1 includes sub-standard shoulder modifications. <br />STATUS <br />The utility relocation phase of this project has been completed. Construction of the realignment project <br />was completed in November 2009. Installation of the median barriers was also completed. <br />PHASING AND SCHEDULE <br />The Vasco Road Safety Improvement Project is scheduled to be constructed in two stages. Shoulder <br />improvements for Phase 1 are expected to be completed by 2020. <br />
The URL can be used to link to this page
Your browser does not support the video tag.