My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />A -10B. VASCO ROAD SAFETY IMPROVEMENTS PHASE 2 <br />TVTC PROJECT SPONSOR <br />Alameda County <br />LEAD AGENCY <br />Alameda County <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project A-10b is located along Vasco <br />Road in Alameda County. <br />Project A-10b is Phase 2 of the Vasco <br />Road Safety Improvements, a two- <br />phase safety improvement project <br />along Vasco Road. Please refer to <br />Project A-10a for details on Phase 1. <br />Phase 2 includes roadway realignment, shoulder widening, and installation of median barriers. This <br />phase of the project will install median barriers along Vasco Road within Alameda County on portions of <br />the roadway not covered by Phase 1. In addition, this phase will include shoulder widening and curve <br />modifications, as needed. Phase 2 of Vasco Road will provide continuous median barrier protection <br />between Contra Costa County and the City of Livermore. The installation of median barriers will eliminate <br />crossover-type collisions that resulted in fatalities in the past. <br />STATUS <br />The Phase 2 project is in the scoping stage. <br />PHASING AND SCHEDULE <br />The Phase 2 project is expected to begin Project Study Report (PSR) in 2016. Alameda County is in <br />progress to retain consultant services. <br />COST ESTIMATE AND FUNDING SOURCES <br /> <br />Cost (Millions) $31.20 <br />Funding (Millions) <br />TVTDF $2.58 <br />Total Funding (Millions) $2.58 <br />Total Funding Shortfall (Millions, 2015) $28.62 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.