TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />3. Dublin Extension – Continued study and planning will be done on how best to integrate the <br />planned extension of Dublin Boulevard and the planned Livermore BART Extension into LAVTA’s <br />Express Bus/BRT service. Element 3 is currently budgeted at $6.5 Million. <br />4. Pleasanton Alignment – Complete “Rapidization,” of the Livermore to Pleasanton alignment will <br />be evaluated, with advanced technology and improved service elements planned for the south side <br />of I-580, and possible connection to the existing Rapid service. Element 4 is currently budgeted at <br />$1.5 Million. <br />5. Park and Ride Lots – In working with local cities and Alameda County, LAVTA will consider <br />improved park and ride elements to support bus, biking, and walking access in the Tri-Valley, and <br />to improve the accessibility of transportation alternatives that would ease congestion on I-580. <br />These options might include: construction of new lots, smart signage, improved bicycle storage, <br />increased pedestrian accessibility and safety, enhanced multi-modal elements on coaches, and <br />increased or revised bus service to rail stations and regional transit connections. Element 5 is <br />currently budgeted at $2 Million. <br />STATUS <br />Phase 1 is fully completed and operational, as of January 2011. <br />Phase 2 is in the research, design, and planning stage. In August 2016, LAVTA realigned the Express <br />Bus/BRT Route (Route 30R) to serve Las Positas College, and transformed existing Route 10 into an <br />Express Bus/BRT (Route 10R) operating through Pleasanton to BART. The transformation of Route 10 <br />into Route 10R was the first step in implementation of the Phase 2 Pleasanton Alignment. LAVTA intends <br />to implement additional items from Phase 2 (Advanced Technology) to both Routes 10R and 30R in <br />2017, which includes upgrading the traffic signal priority onboard the buses and at key intersections along <br />both Rapid routes. <br />PHASING AND SCHEDULE <br />Costs for Phase 2 have been updated to reflect current pricing for the project elements listed above. <br />Phase 2 Scope of work, schedule, and full funding parameters are not known at this time. <br />COST ESTIMATE AND FUNDING SOURCES <br />Phase 2: <br />Cost (Millions) $22.35 <br />Funding (Millions) <br />TVTDF $1.94 <br />Total Funding (Millions) $1.94 <br />Total Funding Shortfall (Millions) $20.41 <br /> <br />