Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />B -7. EL CHARRO ROAD EXTENSION (STONERIDGE DRIVE/JACK LONDON <br />BOULEVARD TO STANLEY BOULEVARD) <br />TVTC PROJECT SPONSOR <br />City of Pleasanton <br />LEAD AGENCY <br />City of Pleasanton <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project B-7 is located along El <br />Charro Road in Pleasanton. The <br />project would extend El Charro Road <br />south from its current terminus at Stoneridge Drive/Jack London Boulevard to connect with Stanley <br />Boulevard. Currently, this section of El Charro Road is a private roadway, but the El Charro extension will <br />be open for public use. <br />The El Charro Road Extension project consists of two phases. <br />• Phase 1 – between I-580 and Stoneridge Drive-Jack London Boulevard <br />• Phase 2 – between Stoneridge Drive-Jack London Boulevard and Stanley Boulevard, <br />approximately 1.7 miles <br />STATUS <br />Phase 1 was completed and open for public use in 2012 with the construction of the Livermore Outlets. <br />Phase 2 has been incorporated into Project C-5 EL Charro Widening, therefore Project B-7 has been <br />removed from the project list and is no longer considered for funding. <br />PHASING AND SCHEDULE <br />The project has been removed from the project list and is no longer considered for funding.