My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-5. EL CHARRO ROAD WIDENING <br />TVTC PROJECT SPONSOR <br />City of Pleasanton <br />LEAD AGENCY <br />City of Pleasanton <br />PROJECT DESCRIPTION <br />(UPDATED SUMMER 2021) <br />Project C-5 will construct El Charro 1.7 <br />miles south of its current terminus at <br />Stoneridge Drive/ Jack London <br />Boulevard. This segment will consist of 4-lane divided road with Class I and Class IV bike facilities, including <br />a bridge over the Arroyo Mocho and a grade separation. <br />STATUS <br />This project has not been started. <br />PHASING AND SCHEDULE <br />Phasing and schedule are unavailable at this time. <br />COST AND FUNDING SOURCES <br /> <br />Cost (Millions) $68.09 <br />Funding (Millions) <br />Pleasanton TIF $30.00 <br />Total Funding (Millions) $30.00 <br />Total Funding Shortfall (Millions) $38.09 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.