My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-7. I-680 EXPRESS LANES – HWY 84 TO ALCOSTA <br />TVTC PROJECT SPONSOR <br /> City of Pleasanton <br />LEAD AGENCY <br />Alameda CTC, City of Pleasanton <br />PROJECT DESCRIPTION (UPDATED SUMMER <br />2021) <br />Project C-7 will close the gap between existing and <br />in-progress HOV/express lane projects to the north <br />and south. The project extends for approximately <br />nine miles on northbound I-680 through Sunol, <br />Pleasanton, Dublin, and San Ramon. <br />Design and construction of this project is being rolled <br />out in two phases: southbound (Phase 1) and <br />northbound (Phase 2). <br />STATUS <br />Environmental and preliminary engineering studies <br />are complete. Phase 1 final design work was <br />initiated in February 2020 and construction for Phase 1 is anticipated to start in 2022. <br />PHASING AND SCHEDULE <br />The project is expected to be constructed in several stages. <br />• Phase 1 (Southbound) – Environmental and preliminary engineering studies are complete. Phase <br />1 final design work was initiated in February 2020 and construction for Phase 1 is anticipated to <br />start in 2022. <br />• Phase 2 (Northbound) - Schedule is undetermined at this time. <br />COST AND FUNDING SOURCES <br /> <br />Cost (Millions) $527.57 <br />Funding (Millions) <br />Measures BB $20.00 <br />TVTDF $21.20 <br />Total Funding (Millions) $41.20 <br />Total Funding Shortfall (Millions) $486.37
The URL can be used to link to this page
Your browser does not support the video tag.