Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Appendix <br />Draft Final Report │ Adopted: April 29, 2022 <br /> <br />C-11H. IRON HORSE TRAIL SYSTEM-WIDE IMPROVEMENTS <br />TVTC PROJECT SPONSOR <br />Contra Costa County, Town of Danville, City of San Ramon Alameda County, City of Dublin, City of <br />Livermore, and City of Pleasanton <br />LEAD AGENCY <br />Contra Costa County, Town of Danville, City of San Ramon Alameda County, City of Dublin, City of <br />Livermore, and City of Pleasanton <br />PROJECT DESCRIPTION (UPDATED SUMMER 2021 ) <br />As the primary regional multi-modal corridor between Contra Costa and Alameda County, the Iron Horse <br />Trail is the spine for active modes of travel in the East Bay. The proposed project for the Iron Horse Trail <br />includes safety, operational, and capacity improvements within the TVTC boundary from Alamo to <br />Livermore. The proposed project and associated cost estimate includes safety improvements at roadway <br />crossings, a proposed parallel path to separate users according to speed, and a buffer between users <br />traveling at high or low speed. The improvements would include features such as passive detection at road <br />crossings, actuated flashers or warning signals at roadway crossings, high visibility markings, minor <br />grading, construction of a new 10 foot wide parallel asphalt path with shoulders, and a buffer between high <br />and low speed corridors which may include vegetation or fencing to maintain safe separation. Other safety <br />improvements may be necessary to fit site conditions and as determined through additional study. <br />Separated grade crossings or bridges that have already been identified as critical for improved vehicle <br />traffic flow at current at grade crossings and to improve safety for trail users are listed as separate projects <br />within the TVTC program. The cost and context for each bridge site warrants a specific project identification <br />rather than to be included within the system-wide improvements under this project. <br />STATUS <br />A phasing plan has not yet been developed. <br />PHASING AND SCHEDULE <br />The phasing and schedule for this project have not been defined. <br />COST AND FUNDING SOURCES <br />Cost (Millions) $85.60 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $85.60 <br />