My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 <br />kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 <br />Project A-2b evaluated Portola Avenue along the I-580 overpass. This segment operates at LOS F in <br />existing and 2040 No Build conditions. Project A-2b will improve operations to acceptable levels of <br />service. <br />Project B-6 evaluated Jack London Boulevard, east of El Charro Road. This segment operates at <br />LOS F in the existing and 2040 No Build conditions. With the project, Jack London Boulevard may <br />continue to operate at LOS F; however, there will be a reduction in v/c. <br />For Project B-8, future development will increase congestion along Camino Tassajara and will cause <br />the roadway to operation at LOS F in 2040 No Build conditions. Project B-8 will improve operations to <br />acceptable levels. <br />Since Project C-5 will extend El Charro Road south of Stoneridge Road/Jack London Boulevard, a <br />parallel route along Santa Rita Road was analyzed. Future development will increase congestion <br />along Santa Rita Road and will cause the roadway to operate at LOS F. Project C-5 will improve <br />operations to acceptable levels. <br />Interchange <br />Interchange analysis was used to evaluate the following projects: <br />· B-3 I-580/First Street Interchange Modification <br />· B-4 I-580/Vasco Road Interchange Modification <br />· B-5 I-580/Greenville Road Interchange Modification <br />· C-6 Sunol/680 Interchange Improvements <br />· C-9 Stoneridge/I-680 Interchange <br />· C-12 Hacienda/I-580 Interchange Improvements <br />· C-13 Fallon/El Charro Interchange Improvements <br />For Project B-3, the I-580/First Street interchange operates at LOS C or better in the existing <br />condition. Future development will increase the delay at the interchange. Project B-3 will reduce delay <br />compared to 2040 No Build conditions. <br />For Project B-4, the I-580/Vasco Road interchange operates at LOS E or better in the existing <br />condition. Future development will cause this interchange to operation at LOS F in the PM peak. <br />Project B-4 will improve operations to acceptable levels of LOS C or better. <br />For Project B-5, the I-580/Greenville Road interchange operates at LOS E or better in the existing <br />condition. Future development will cause this interchange to operate at LOS F in PM peak. Project B- <br />5 will improve operations to acceptable levels of LOS E or better. <br />For Project C-6, the I-680/Sunol Boulevard interchange operate at LOS F in the existing and 2040 No <br />Build conditions. Project C-6 will improve operations to acceptable levels of LOS B or better.
The URL can be used to link to this page
Your browser does not support the video tag.