My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 <br />kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 <br />The crossing at Bollinger Canyon Road (Project C-11a)has a LTS of 4 in the existing condition . The <br />crossing will continue to have a LTS of 4 in the future conditions. Project C-11a will construct an <br />overcrossing which will improve the LTS to LTS 0. <br />The crossing at Crow Canyon Road (Project C-11b)has a LTS of 4 in the existing condition. The <br />crossing will continue to have a LTS of 4 in the future conditions. Project C-11b will construct an <br />overcrossing which will improve the LTS to LTS 0. <br />The crossing at Dublin Road (Project C-11c)has a LTS of 4 in the existing condition. The crossing <br />will continue to have a LTS of 4 in the future conditions. Project C-11c will construct an <br />bicycle/pedestrian bridge which will improve the LTS to LTS 0. <br />Project C-11d will construct new trail segments, so there are no LTS for existing or 2040 No project <br />conditions. Project C-11d will construct LTS 1 trail segment. <br />Project C-11e will construct new trail segments, so there are no LTS for existing or 2040 No project <br />conditions. Project C-11e will construct LTS 1 trail segment. <br />Project C-11f will construct new trail segments, so there are no LTS for existing or 2040 No project <br />conditions. Project C-11e will construct LTS 1 trail segment. <br />The crossing at Sycamore Valley Road (Project C-11g)has a LTS of 4 in the existing condition. The <br />crossing will continue to have a LTS of 4 in the future conditions. Project C-11g will construct an <br />overcrossing which will improve the LTS to LTS 0. <br />Project C-11h will provide system-wide improvements, such as closing existing gaps in the trail <br />system, therefore it was assumed that there is no LTS for existing or 2040 No project conditions. <br />Project C-11h will construct LTS 1 trail segment to fill in existing gaps and other improvements. <br />Intersection <br />Intersection analysis evaluate the following projects: <br />· C-4 Vasco Road at Dalton Avenue Intersection Improvements <br />· C-8 Santa Rita/I-580 Interchange <br />Project C-4 evaluated Vasco Road and Dalton Avenue intersection. This intersection operates at <br />LOS F in existing and 2040 No Build conditions. Project C-4 will improve operations to acceptable <br />levels. <br />Project C-8 evaluated Santa Rita Road and I-580 EB Ramps/Pimilico Drive intersection. This <br />intersection operated at LOS D or better in existing conditions. Future development will increase <br />congestion at this intersection. The project will improve operation compared to 2040 No Build <br />conditions.
The URL can be used to link to this page
Your browser does not support the video tag.