My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 <br />kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 <br />Technology <br />There are two technology projects: C-10 Innovate 680 and C-15 Technology Enhancements. Since <br />these are studies and not public facilities, no MOE or thresholds were established at this time. However, <br />a qualitative assessment was conducted to determine how the technology being studied may result in <br />delay or congestion reductions or other benefits. <br />Project C-10 Innovate 680 consists of multiple components including transit infrastructure and service <br />improvements, roadway improvements, and technology enhancement, this project has been <br />categorized as a technology improvement because TVTDF funding is being requested only for the <br />Advance Technology component of the project. Other project components are expected to be funded <br />through alternative sources. The Advance Technology component consists of implementing three <br />technology-related strategies to improve operation along the I-680 corridor. Strategies include providing <br />an enhanced 511 mobile app and implementing a shared autonomous vehicles (SAV) program for first <br />and last mile connectivity and access at Mobility Hubs, to shift travel away from single occupant vehicles <br />by providing travelers with better information about mode choice opportunities, resultant travel time, <br />cost per trip, and the availability of transit. Other technology strategies include integrating adaptive <br />ramp metering and/or corridor/incident management systems which can help improve the efficiency <br />and safety of the transportation system. <br />Project C-15 Technology Enhancements proposes to provide connectivity for transit and vehicles <br />between local arterials and regional facilities. The project is expected to be completed in three phases <br />- Feasibility, Design & Construction. The TVTDF will help fund the feasibility study phase of the study, <br />since the details of the design and construction phase are unknown at this time. The feasibility study <br />will focus on the first and last mile connectivity opportunities at key transit hubs and along major transit <br />routes in the Tri-Valley area. Leveraging existing and emerging technology, such as connected and <br />autonomous vehicles, may help increase safety and mobility for all modes. These technologies may <br />also help with increasing transit ridership or expanding transit service to less-served areas, especially <br />for communities that currently lack service. Given that the resultant projects are intended to offset the <br />impacts of future development, the feasibility study is appropriate to include in the TVTC project list. <br />AB 602 Proportional Allocation <br />Future development is responsible for paying for its proportional use of public facilities, rather than <br />the full unfunded cost of projects. Under AB 602s project-specific analysis methods , the proportional <br />allocation of costs for certain projects under the 2020 TVTC Nexus Study would be lower.ܣܤ 602 ܲݎݎݐ݈݅݊ܽ ܣ݈݈ܿܽݐ݅݊ %=2040 ܰ ܤݑ݈݅݀ ܩݎݓݐℎܧݔ݅ݏݐ݅݊݃ ܸ݈ݑ݉݁ <br /> AB 602 proportional allocation calculations are included in Attachment A. <br />AB 602 Analysis Maximum Fee Rate <br />Table 10 presents the AB 602 maximum fee. Historically, TVTC jurisdictions have not applied the <br />maximum fee schedule, therefore Table 10 also presents the rate being proposed as part of the 2022
The URL can be used to link to this page
Your browser does not support the video tag.