My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Methodology Existing <br />Volume <br />Future <br />Volume Growth <br />AB 602 <br />Proportion <br />Allocation% <br />C-11e Iron Horse Trail to Shadow Cliffs Pedestrian/Bicycle ---100% <br />C-11f Iron House Trail Connection Improvements at Santa Rita Road Pedestrian/Bicycle ---100% <br />C-11g Iron Horse Trail Bicycle/Pedestrian Overcrossing – Sycamore Valley Road Pedestrian/Bicycle 4,000 6,000 2,000 50% <br />C-11h Iron Horse Trail System-wide Improvements Pedestrian/Bicycle ---100% <br />C-12 Hacienda/I-580 Interchange Improvements Roadway Capacity - Interchange ---100% <br />C-13 Fallon/El Charro Interchange Improvements Roadway Capacity - Interchange ---100% <br />C-14 Valley Link Rail (Phase 1)Transit ---100% <br />C-15 Technology Enhancements Technology --- 100% <br />C-16 I-680 Express Bus Service Transit ---100% <br />Project C-2: Growth is based on the percentages of TVTC road users along project corridor. <br />Note <br />Project B-6: Growth exceed 100%, therefore AB 602 proportion allocation was assumed to be 100%
The URL can be used to link to this page
Your browser does not support the video tag.