Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 40 <br /> <br />Cost and Funding Source <br /> <br />Cost (Millions) $18.87 <br />Funding (Millions) <br />CMA TIP $0.45 <br />Local Alameda County $0.45 <br />TVTDF $1.55 <br />Total Funding (Millions) $2.45 <br />Total Funding Shortfall (Millions) $8.42 <br />A -9B. CROW CANYON ROAD IMPROVEMENTS PHASE 2 <br />TVTC Project Sponsor: Alameda County <br />Lead Agency: Alameda County <br />Project Description: Project A-9b is located along Crow Canyon Road between E. Castro Valley <br />Boulevard and the Alameda/Contra Costa County Line. <br />Project A-9b is Phase 2 of the two-phase safety improvement project along Crow Canyon Road. Please <br />refer to Project A-9a for details on Phase 1. <br />Phase 2 safety improvements include roadway realignment, shoulder widening, roundabouts, two-way left <br />turn lanes (as needed), and tunnels at post mile (PM) 2.15. <br />This project will increase safety for motorists traveling along this major arterial roadway between Castro <br />Valley in Alameda County and San Ramon in Contra Costa County. The realignment of various curves, <br />shoulder widening, and tunnels at PM 2.15 will facilitate improved traffic operations and reduce congestion <br />for residents traveling between Alameda and Contra Costa Counties. <br />Status: This project is in the scoping stage. Construction is expected to begin after completion of Phase 1 <br />(Project A-9a). Phasing and schedule have not yet been determined. <br />Cost and Funding Source <br /> <br />Cost (Millions) $58.77 <br />Funding (Millions) <br />TVTDF $1.69 <br />Total Funding (Millions) $1.69 <br />Total Funding Shortfall (Millions, 2015) $57.08 <br />A -10A. VASCO ROAD SAFETY IMPROVEMENTS PHASE 1 <br />TVTC Project Sponsor: Alameda County <br />Lead Agency: Alameda County