My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 41 <br /> <br />Project Description: Project A-10a is located along Vasco Road in Alameda County. <br />Project A-10a is Phase 1 of the Vasco Road Safety Improvements, a two-phase safety improvement project <br />along Vasco Road. The project includes roadway realignment, shoulder widening, and installment of <br />median barriers along Vasco Road. Please refer to Project A-10b for details on Phase 2. <br />Roadway realignments have been completed and consisted of straightening the alignment of Vasco Road <br />at about 1.8-miles north of the Livermore city limits to the Alameda/Contra Costa county line. A median <br />barrier has been installed between the Contra Costa County line and about 1.8-miles north of the Livermore <br />city limits. The installation of median barriers eliminates crossover-type collisions that resulted in fatalities <br />in the past. The realignment of tight curves facilitates Tri Delta bus services between Alameda and Contra <br />Costa Counties. <br />The remaining components of Phase 1 includes sub-standard shoulder modifications. <br />Status: The utility relocation phase of this project has been completed. Construction of the realignment <br />project was completed in November 2009. Installation of the median barriers was also completed. The <br />Vasco Road Safety Improvement Project is scheduled to be constructed in two stages. Shoulder <br />improvements for Phase 1 are expected to be completed by 2020. <br /> <br />Cost and Funding Sources <br />Cost (Millions) $40.57 <br />Funding (Millions) <br />Measure B $1.50 <br />STIP $4.60 <br />TCRP $6.50 <br />Local Alameda County $2.81 <br />STP/CMAQ $3.90 <br />Prop 1-B $6.00 <br />Fed demo $0.80 <br />TVTDF $3.32 <br />Total Funding (Millions) $29.43 <br />Total Funding Shortfall (Millions, 2015) $11.14 <br />A -10B. VASCO ROAD SAFETY IMPROVEMENTS PHASE 2 <br />TVTC Project Sponsor: Alameda County <br />Lead Agency: Alameda County <br />Project Description: Project A-10b is located along Vasco Road in Alameda County. Project A-10b is <br />Phase 2 of the Vasco Road Safety Improvements, a two-phase safety improvement project along Vasco <br />Road. Please refer to Project A-10a for details on Phase 1. <br />Phase 2 includes roadway realignment, shoulder widening, and installation of median barriers. This phase <br />of the project will install median barriers along Vasco Road within Alameda County on portions of the <br />roadway not covered by Phase 1. In addition, this phase will include shoulder widening and curve <br />modifications, as needed. Phase 2 of Vasco Road will provide continuous median barrier protection
The URL can be used to link to this page
Your browser does not support the video tag.