My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 44 <br /> <br />• Identify the need for updates/revisions to identify financially feasible improvements to address the <br />latest safety, operational, and congestion issues <br />The Alameda CTC’s 2014 Transportation Expenditure Plan (TEP), approved as part of Measure BB, <br />includes $20 Million in funding for I-580/I-680 Interchange improvements. Further project development is <br />being explored. Alameda CTC is working with local, regional, and state agencies in identifying funding. <br />The Alameda CTC’s 2020 Countywide Transportation Plan (CTP) split this project into two phases. Phase <br />1 is part of the County’s 10-year priory project list, while Phase 2 is listed under 30-Year project list. <br />Cost and Funding Sources <br />Cost (Millions, 2015) $1,785.65 <br />Funding (Millions, 2015) <br />Measure BB $20.00 <br />TVTDF $1.00 <br />Total Funding (Millions, 2015) $21.00 <br />Total Funding Shortfall (Millions, 2015) $1,764.65 <br />B -2. FIFTH EASTBOUND LANE ON I-580 (SANTA RITA ROAD TO VASCO <br />ROAD) <br />TVTC Project Sponsor: City of Pleasanton, City of Livermore <br />Lead Agency: Alameda CTC <br />Project Description: Project B-2 is located along eastbound I-580 between Santa Rita Road and Vasco <br />Road. The project would construct a fifth eastbound mixed flow lane and would eliminate the lane drop at <br />Santa Rita Road. <br />Status: This project has been completed. <br />B -3. I-580/FIRST STREET INTERCHANGE MODIFICATION <br />TVTC Project Sponsor: City of Livermore <br />Lead Agency: Caltrans <br />Project Description: Project B-3 is located at the I-580/First Street interchange in Livermore. The project <br />would modify the interchange by widening the overcrossing to six lanes and reconstructing the ramps to <br />achieve a partial cloverleaf interchange design. <br />Status: A PSR has been completed. The project schedule and phasing are not available at this time. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.