My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 43 <br /> <br />4. Pleasanton Alignment – Complete “Rapidization,” of the Livermore to Pleasanton alignment will <br />be evaluated, with advanced technology and improved service elements planned for the south side <br />of I-580, and possible connection to the existing Rapid service. Element 4 is currently budgeted at <br />$1.5 Million. <br />5. Park and Ride Lots – In working with local cities and Alameda County, LAVTA will consider <br />improved park and ride elements to support bus, biking, and walking access in the Tri-Valley, and <br />to improve the accessibility of transportation alternatives that would ease congestion on I-580. <br />These options might include: construction of new lots, smart signage, improved bicycle storage, <br />increased pedestrian accessibility and safety, enhanced multi-modal elements on coaches, and <br />increased or revised bus service to rail stations and regional transit connections. Element 5 is <br />currently budgeted at $2 Million. <br />Status: Phase 1 is fully completed and operational, as of January 2011. Phase 2 is in the research, design, <br />and planning stage. In August 2016, LAVTA realigned the Express Bus/BRT Route (Route 30R) to serve <br />Las Positas College, and transformed existing Route 10 into an Express Bus/BRT (Route 10R) operating <br />through Pleasanton to BART. The transformation of Route 10 into Route 10R was the first step in <br />implementation of the Phase 2 Pleasanton Alignment. LAVTA intends to implement additional items from <br />Phase 2 (Advanced Technology) to both Routes 10R and 30R in 2017, which includes upgrading the traffic <br />signal priority onboard the buses and at key intersections along both Rapid routes. Costs for Phase 2 have <br />been updated to reflect current pricing for the project elements listed above. Phase 2 Scope of work, <br />schedule, and full funding parameters are not known at this time. <br />Cost and Funding Sources <br />Phase 2: <br />Cost (Millions) $22.35 <br />Funding (Millions) <br />TVTDF $1.14 <br />Total Funding (Millions) $1.14 <br />Total Funding Shortfall (Millions) $21.21 <br />B -1. I-580/I-680 INTERCHANGE (WESTBOUND TO SOUTHBOUND) <br />TVTC Project Sponsor: City of Dublin <br />Lead Agency: Alameda CTC <br />Project Description: Project B-1 is located at the I-580/I-680 Interchange in Alameda County. The <br />proposed project limits are from 1,700 feet east of the Hacienda Drive Overcrossing to 2,000 feet west of <br />the San Ramon Road Overcrossing along I-580, and from the Amador Valley Boulevard Undercrossing to <br />3,400 feet south of the Stoneridge Drive Overcrossing along I-680. <br />Status: A Project Study Report-Project Development Support (PSR-PDS) was completed and approved <br />by Caltrans in 2009. <br />The next steps in project development will be to: <br />• Review the existing PSR-PDS to validate the information
The URL can be used to link to this page
Your browser does not support the video tag.