Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 46 <br /> <br />Cost and Funding Sources <br /> <br />Cost (Millions) $86.00 <br />Funding (Millions) <br />Livermore TIF $67.08 <br />Total Funding (Millions) $67.08 <br />Total Funding Shortfall (Millions) $18.92 <br />B -6. JACK LONDON BOULEVARD EXTENSION <br />TVTC Project Sponsor: City of Livermore <br />Lead Agency: City of Livermore <br />Project Description: Project B-6 is located along Jack London Boulevard in Livermore. The project would <br />widen Jack London Boulevard to El Charro Road as a four-lane arterial roadway. <br />The project will be constructed in two phases. <br />• Phase 1 - two lane extension <br />• Phase 2 – relocate a portion of the roadway south of the Livermore Airport to its ultimate <br />alignment <br />Status: An EIR, design, right-of-way acquisition, and construction of the two-lane extension (Phase 1) <br />has been completed. <br />The project is expected to be constructed in two phases. <br />• Phase 1 – Completed 2009. <br />• Phase 2 - Will not commence until after the quarries have completed mining operations. <br />Cost and Funding Sources <br />Phase 2: <br />Cost (Millions) $28.16 <br />Funding (Millions) <br />Livermore TIF $18.08 <br />Total Funding (Millions) $18.08 <br />Total Funding Shortfall (Millions) $10.08 <br />B -7. EL CHARRO ROAD EXTENSION (STONERIDGE DRIVE/JACK LONDON <br />BOULEVARD TO STANLEY BOULEVARD) <br />TVTC Project Sponsor: City of Pleasanton <br />Lead Agency: City of Pleasanton