My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 47 <br /> <br />Project Description: Project B-7 is located along El Charro Road in Pleasanton. The project would extend <br />El Charro Road south from its current terminus at Stoneridge Drive/Jack London Boulevard to connect with <br />Stanley Boulevard. Currently, this section of El Charro Road is a private roadway, but the El Charro <br />extension will be open for public use. <br />The El Charro Road Extension project consists of two phases. <br />• Phase 1 – between I-580 and Stoneridge Drive-Jack London Boulevard <br />• Phase 2 – between Stoneridge Drive-Jack London Boulevard and Stanley Boulevard, <br />approximately 1.7 miles <br />Status: Phase 1 was completed and open for public use in 2012 with the construction of the Livermore <br />Outlets. Phase 2 is dependent on the status/development of the East Pleasanton Specific Plan. This plan <br />will identify the land use and circulation along the future El Charro Road and will identify a timeline for <br />opening of this roadway for public use. It is anticipated that the project will be constructed with the first <br />stages of the East Side Specific Plan development. The City of Pleasanton began the East Pleasanton <br />Specific Plan in 2013 and the Pleasanton City Council, in 2015, determined that the completion of the Plan <br />would occur at a later date and the Plan adoption was placed on hold. <br />The project is expected to be constructed in several stages. <br />• Phase 1 – Completed and opened to traffic in 2012. <br />• Phase 2 – Schedule is undetermined at this time. <br />Cost and Funding Sources <br />Cost (Millions) $72.48 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $72.48 <br />B -8. CAMINO TASSAJARA/TASSAJARA ROAD WIDENING PROJECT (EAST <br />OF BLACKHAWK DRIVE TO NORTH DUBLIN RANCH DRIVE) <br />TVTC Project Sponsor: Contra Costa County, City of Dublin <br />Lead Agency: Contra Costa County, City of Dublin <br />Project Description: Project B-8 is located along Camino Tassajara-Tassajara Road. This project <br />consists of two project phases: <br />Safety Improvement Project – Blackhawk Drive in Contra Costa County to Moller Ranch (Palisades Drive) <br />in the City of Dublin <br />• The safety improvement project will widen Camino Tassajara from two to four lanes from East of <br />Blackhawk Drive to Moller Ranch (Palisades Drive) in the City of Dublin. The project may also <br />include realignment of various horizontal curves along the roadway. Interim improvements may <br />include roadway widening to meet two-lane rural road standards with sufficient lane width and
The URL can be used to link to this page
Your browser does not support the video tag.