My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 51 <br /> <br /> <br />B -11B. I-680 TRANSIT CORRIDOR IMPROVEMENTS <br />TVTC Project Sponsor: City of San Ramon <br />Lead Agency: CCTA <br />Other Involved Parties: Caltrans, Southwest Area Transportation (SWAT) Committee, Transportation <br />Partnership and Cooperation (TRANSPAC) <br />Project Description: Project B.11b is located along I-680 in San Ramon Valley. The project would fund a <br />corridor express lane and operational improvements to facilitate carpools, vanpools and increase transit <br />use in the corridor as an alternative to single occupant vehicle travel. Funding may also be used to <br />implement high capacity transit improvements along I-680. These improvements may include an express <br />lane, relevant transit projects, advanced traffic management programs, and/or autonomous or connected <br />vehicles. <br />Status: A Project Study “I-680 Transit Investment Congestion Relief Study” was completed in 2015 with <br />Measure J funds. Specific details for this project will be further developed when additional funding is <br />identified. Phasing and schedule are unavailable at this time. <br />Cost Estimate and Funding Sources: <br />Cost (Millions) $277.85 <br />Funding (Millions) <br />Measure J $1.00 <br />TVTDF $2.00 <br />Total Funding (Millions) $3.00 <br />Total Funding Shortfall (Millions) $274.85 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.