My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 53 <br /> <br />Cost and Funding Sources: <br />Contra Costa County (Segment 1 & 2): <br />Cost (Millions) $8.00** <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $8.00 <br /> **Segment 1: $2 million, Segment 2: $6 million <br /> <br />Alameda County (Segment 3): <br />Cost (Millions) $16.49 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $16.49 <br />C- 3 DUBLIN BOULEVARD – NORTH CANYONS PARKWAY EXTENSION <br />TVTC Project Sponsor: Dublin and Livermore <br />Project Description: This project will construct the street extension to connect Dublin Blvd at Fallon Road <br />in Dublin with North Canyons Parkway in Livermore at Doolan Road. The preliminary phase (currently <br />underway) of this planned project will update the project by incorporating multimodal travel, and the current <br />State, regional, and local priorities. <br />Dublin Boulevard - North Canyons Parkway Extension project would extend Dublin Boulevard in Dublin at <br />its current terminus at Fallon Road to North Canyons Parkway in Livermore. The new extended street is <br />planned to have 4 to 6 travel lanes, bike lanes, sidewalks, curb and gutter, traffic signals/roundabouts, a <br />raised median, bus stops, and all street utilities. This project will consider the provision of dedicated transit <br />lanes in addition to the mixed flow travel lanes for higher level of transit service with 10 to 20-minute <br />headways during appropriate peak demand periods. This project will also require enhanced multimodal <br />connectivity to various land uses along its stretch and at its terminus, including connectivity to 5 PDAs. <br />While addressing Sustainable Communities Strategies, circulation inside and outside the PDAs will be <br />incorporated as part of the design. This project is currently in Preliminary Design Phase (funded by local <br />monies) including the environmental analysis for the project. It will require design and construction funding. <br />Status: Environmental phase is complete. Currently in design phase. Anticipated to complete design in <br />2023. Subsequent milestones are TBD. <br />Cost and Funding Sources <br />Cost (Millions) $160.39 <br />Funding (Millions) <br />Measure BB $7.75 <br />Federal $0.54 <br />Local $17.20 <br />Total Funding (Millions) $25.49 <br />Total Funding Shortfall (Millions) $134.91
The URL can be used to link to this page
Your browser does not support the video tag.