My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 59 <br /> <br />C-11C IRON HORSE TRAIL CROSSING AT DUBLIN BOULEVARD <br />TVTC Project Sponsor: Dublin <br />Project Description: This project will build a bicycle and pedestrian bridge over Dublin Boulevard in order <br />to connect two segments of the Iron Horse Trail. This bridge will create a total separation between vehicles <br />and bicyclists/pedestrians. This will eliminate the possibility of motorized vehicles and pedestrians having <br />a collision, making this segment of the road safer for all users. Along with this, congestion will be reduced <br />as cars will no longer have to wait for pedestrians. This reduction of congestion will also allow for the transit <br />to operate more efficiently. Pedestrians and bicyclists will also not have to wait for a walk signal since they <br />will be able to continue their walk or ride without stopping. <br />The bridge will follow ADA requirements so that disabled people will be able to use it as well. This bridge <br />will also be aesthetically pleasing in order to attract users and improve the user’s experience. The bridge <br />will also connect BART to Dublin in a safe manner, encouraging recreational user of the Iron Horse Trail <br />and the opening of local businesses. This safe and fast route of crossing the Iron Horse Trail will promote <br />walking and bicycling for both recreational and commuting purposes in Dublin, this encouraging the shift <br />from motorized vehicles to alternative forms of transportation. <br />Status: The project is currently in the final design phase. Additionally, Environmental Analysis of the <br />project is currently in-progress. <br />Cost and Funding Sources <br />Cost (Millions) $11.60 <br />Funding (Millions) <br />2014 MBB $6.05 <br />TFCA $0.86 <br />Local $0.23 <br />Private $1.00 <br />Total Funding (Millions) $11.60 <br />Total Funding Shortfall (Millions) - <br />C-11D IRON HORSE TRAIL <br />TVTC Project Sponsor: Livermore <br />Project Description: This project will extend existing trail and provide gap closures. <br />Status: Feasibility Study/Environmental Complete <br />Cost and Funding Sources <br />Cost (Millions) $26.99 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $26.99
The URL can be used to link to this page
Your browser does not support the video tag.