Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 58 <br /> <br />Cost and Funding Sources <br /> <br />Cost (Millions) $22.88 <br />Funding (Millions) <br />OBAG2 $4.80 <br />Measure J (Transportation for Livable <br />Communities) $2.51 <br />Measure J (TLC future year pre- <br />commitment) $4.98 <br />San Ramon General Fund $2.00 <br />Total Funding (Millions) $14.30 <br />Total Funding Shortfall (Millions) $8.58 <br />C-11B IRON HORSE TRAIL BICYCLE PEDESTRI AN OVERCROSSING – CITY <br />OF SAN RAMON <br />TVTC Project Sponsor: CCTA/San Ramon/CCC <br />Project Description: The Iron Horse Trail (IHT) is an 18-mile regional non-motorized trail that runs <br />north/south through the San Ramon Valley providing critical access to adjacent land uses. The construction <br />of overcrossings at key locations will develop attractive travel alternatives for congestion relief for commute <br />trips as well as better facilities for school, shopping, and recreations trips. For the scope of this project, the <br />proposed overcrossing location is Bollinger Canyon Road. At this location, the overcrossing will provide <br />substantial benefits including: <br />1. Improve safety by eliminating conflicts between pedestrians, bicyclists, and motorists; <br />2. Improve motor vehicle circulation by removing the at-grade crossings; <br />3. Reduce and eliminate unsafe crossing maneuvers by pedestrians and bicyclists; <br />4. Enhance safety by providing an environment that encourages walking and bicycling along the <br />Iron Horse Regional Trail; and <br />5. Increase trail usage by improving the connectivity at the Bollinger Canyon Road and Crow <br />Canyon Road crossings. <br />Status: Currently in PA&ED, CEQA Completed <br />Cost and Funding Sources <br />Cost (Millions) $19.69 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $19.69 <br />