Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 61 <br /> <br />C-11G IRON HORSE TRAIL BICYCLE/PEDESTRIAN OVERCROSSING – <br />TOWN OF DANVILLE <br />TVTC Project Sponsor: Danville/CCC/CCTA <br />Project Description: The Iron Horse Trail (IHT) is an 18-mile regional non-motorized trail that runs <br />north/south through the San Ramon Valley providing critical access to adjacent land uses. The construction <br />of overcrossings at key locations will develop attractive travel alternatives for congestion relief for commute <br />trips as well as better facilities for school, shopping, and recreations trips. For the scope of this project, the <br />proposed overcrossing location is Bollinger Canyon Road. At this location, the overcrossing will provide <br />substantial benefits including: <br />1. Improve safety by eliminating conflicts between pedestrians, bicyclists, and motorists; <br />2. Improve motor vehicle circulation by removing the at-grade crossings; <br />3. Reduce and eliminate unsafe crossing maneuvers by pedestrians and bicyclists; <br />4. Enhance safety by providing an environment that encourages walking and bicycling along the <br />Iron Horse Regional Trail; and <br />5. Increase trail usage by improving the connectivity at the Bollinger Canyon Road and Crow <br />Canyon Road crossings. <br />Status: PSR (Feasibility Study) completed. Project will require coordination, permitting, and agreements <br />with Contra Costa County. East Bay Regional Parks Direct and various utilities. <br />Cost and Funding Sources <br />Cost (Millions) $19.78 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $19.78 <br />C-11H IRON HORSE TRAIL SYSTEM-WIDE IMPROVEMENTS <br />TVTC Project Sponsor: Contra Costa County, Town of Danville, City of San Ramon, Alameda County, <br />City of Dublin, City of Livermore, and City of Pleasanton <br />Project Description: As the primary regional multi-modal corridor between Contra Costa and Alameda <br />County, the Iron Horse Trail is the spine for active modes of travel in the East Bay. The proposed project <br />for the Iron Horse Trail includes safety, operational, and capacity improvements within the TVTC boundary <br />from Alamo to Livermore. The proposed project and associated cost estimate includes safety improvements <br />at roadway crossings, a proposed parallel path to separate users according to speed, and a buffer between <br />users traveling at high or low speed. The improvements would include features such as passive detection <br />at road crossings, actuated flashers or warning signals at roadway crossings, high visibility markings, minor <br />grading, construction of a new 10 foot wide parallel asphalt path with shoulders, and a buffer between high <br />and low speed corridors which may include vegetation or fencing to maintain safe separation. Other safety <br />improvements may be necessary to fit site conditions and as determined through additional study. <br />Separated grade crossings or bridges that have already been identified as critical for improved vehicle <br />traffic flow at current at grade crossings and to improve safety for trail users are listed as separate projects