My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 62 <br /> <br />within the TVTC program. The cost and context for each bridge site warrants a specific project identification <br />rather than to be included within the system-wide improvements under this project. <br />Status: A phasing plan has not yet been developed. <br />Cost and Funding Sources: <br />Cost (Millions) $85.60 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $85.60 <br />C-12 I -680 INTERCHANGE IMPROVEMENTS AT H ACIENDA DRIVE <br />TVTC Project Sponsor: Dublin and Pleasanton <br />Project Description: Implement I-580 Hacienda Drive Interchange Improvements, which includes <br />reconstructing the overcrossing to add lanes. <br />I-580/Hacienda Drive interchange Improvements will include; reconstruction of overcrossing to provide <br />additional northbound lane; widening of the eastbound off-ramp to include an additional lane to be used as <br />a combined left and right turn lane; modifying signal and striping, modifying the westbound loop on-ramp; <br />and widening of the westbound off-ramp to include a third left-turn lane. <br />Status: The project is currently in Preliminary Engineering phase and an EIR is currently underway. <br />Cost and Funding Sources <br />Cost (Millions) $39.13 <br />Funding (Millions) <br />Dublin TIF $4.95 <br />Pleasanton TIF $0.04 <br />Total Funding (Millions) $4.63 <br />Total Funding Shortfall (Millions) $34.50 <br />C-13 FALLON/EL CHARRO INTERCHANGE <br />TVTC Project Sponsor: Pleasanton, Dublin, Livermore <br />Project Description: I-580/El Charro Road Interchange Improvements (Phase 2): reconstruction of <br />overcrossing to provide four-lanes in each direction with bike lanes; reconstruction of the southbound to <br />eastbound loop on-ramp; widening of the eastbound off-ramp to provide two exit lanes with two left turn <br />and two right tum lanes; widening of the eastbound on-ramp; widening of the westbound off-ramp to provide <br />two left tum and two right tum lanes; and widening of the westbound on-ramp. <br />Status: The project has not yet started. <br />
The URL can be used to link to this page
Your browser does not support the video tag.