My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 66 <br /> <br />APPENDIX C – PROJECT IMPROVEMENT CATEGORIES <br /> <br /> Project Improvement <br />Category* <br />A-2a State Route 84 (SR 84) Expressway (I-580 to I-680) Roadway Capacity <br />A-2b SR 84/I-580 Interchange Roadway Capacity <br />A-9a Crow Canyon Road Improvements Phase 1 Safety <br />A-9b Crow Canyon Road Improvements Phase 2 Safety <br />A-10a Vasco Road Safety Improvements Phase 1 Safety <br />A-10b Vasco Road Safety Improvements Phase 2 Safety <br />A-11 Express Bus/Bus Rapid Transit (BRT) – Phase 2 Safety <br />B-1 I-580/I-680 Interchange (westbound to southbound) Roadway Capacity <br />B-3 I-580/First Street Interchange Modification Roadway Capacity <br />B-4 I-580/Vasco Road Interchange Modification Roadway Capacity <br />B-5 I-580/Greenville Road Interchange Modification Roadway Capacity <br />B-6 Jack London Boulevard Extension Roadway Capacity <br />B-7 El Charro Road Extension (Stoneridge Drive/Jack London Boulevard <br />to Stanley Boulevard) Roadway Capacity <br />B-8 Camino Tassajara/Tassajara Road Widening Project (East of <br />Blackhawk Drive to North Dublin Ranch Drive) <br />Roadway Capacity <br />Safety <br />B-10 I-680 Southbound HOV Lane Gap Closure (North Main Street to <br />Rudgear Road) Roadway Capacity <br />B-11b I-680 Transit Corridor Improvements Transit <br />C-1 Tesla Road Safety Improvements Safety <br />C-2 Norris Canyon Road Safety Improvement Safety <br />C-3 Dublin Boulevard – North Canyons Parkway Extensions Roadway Capacity <br />C-4 Vasco Road at Dalton Avenue Intersection Improvements Intersection <br />C-5 El Charro Road Widening Roadway Capacity <br />C-6 Sunol/680 Interchange Improvements Roadway Capacity <br />C-7 I-680 Express Lanes – Hwy 84 to Alcosta Roadway Capacity <br />C-8 Santa Rita/I-580 Interchange Intersection <br />C-9 Stoneridge/I-680 Interchange Roadway Capacity <br />C-10 Innovate 680 Technology <br />C-11a Iron Horse Trail Bicycle-Pedestrian Overcrossing – Bollinger Canyon <br />Road Pedestrian/Bicycle <br />C-11b Iron Horse Trail Bicycle-Pedestrian Overcrossing – Crow Canyon <br />Road Pedestrian/Bicycle <br />C-11c Iron Horse Trail – Dublin Pedestrian/Bicycle <br />C-11d Iron Horse Trail – Livermore Pedestrian/Bicycle <br />C-11e Iron Horse Trail to Shadow Cliffs Pedestrian/Bicycle <br />C-11f Iron House Trail Connection Improvements at Santa Rita Road Pedestrian/Bicycle <br />C-11g Iron Horse Trail Bicycle/Pedestrian Overcrossing – Sycamore Valley <br />Road Pedestrian/Bicycle
The URL can be used to link to this page
Your browser does not support the video tag.