My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 65 <br /> <br />The project proposes to place express bus stops in the Tri-Valley area at the West Dublin/Pleasanton BART <br />Station and at a future park and ride to be constructed at the Bernal Avenue interchange in Pleasanton. <br />Understanding that the express buses must merge across all lanes of traffic to access the express lane, <br />these stop locations are spaced to efficiently serve the Tri-Valley area while also maximizing the express <br />lane distance the bus is able to utilize in-between bus stops. <br />The estimated costs below assume that at each bus stop location there would be construction of roadway <br />and bus stop improvements, including installation of transit amenities such as shelters, bike lockers, <br />lighting, and real time information signs. <br />Status: A project schedule has not yet been developed. <br /> <br />Cost and Funding Sources: <br />Cost (Millions) $59.35 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $59.35
The URL can be used to link to this page
Your browser does not support the video tag.