Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Chapter 1: Introduction <br />Draft Final Report │ April 29, 2022 2 <br /> <br />impact fee revenues from member agencies to help implement transportation improvement projects within <br />the Tri-Valley Area. One of the primary duties of the TVTC is the preparation of a TVTP/AP and cost <br />sharing of recommended improvements. As previously noted, the TVTP/AP was originally prepared and <br />presented to all member jurisdictions in April 1995. The TVTP/AP has been subsequently updated in <br />2004, 2009, 2013, and 2017. <br />In January 2015, the TVTC adopted Resolution No. 2015-01 – Adopting the updated Tri-Valley <br />Transportation Development Fee Schedule as a two-year phase-in plan, with no change during the initial <br />year (FY 14/15), an increase to 25% of the maximum allowable rate by the fee nexus study in the second <br />year (FY 15/16) and a final increase to 35% of the maximum allowable rate by the third year (FY 16/17). <br />The new fee was based on the Fee Nexus Study adopted in 2008. <br />In November 2015 a review of the 2008 Nexus Study was conducted to determine if a reasonable <br />relationship between the unexpended fees and the purpose for which those fees were collected remain <br />valid. This comparison analyzed the 2008 Nexus Study Fee Update in consideration of then current traffic <br />conditions, forecasted growth, and project updates and found that the unexpended fees and the purpose <br />of which those fees were collected remained valid 1. <br />In January 2017, the TVTC approved the 2008 TVTC Nexus Study Validation Review and adopted the <br />2017 SEP Update. At that time the TVTC elected to maintain the current fee rate, with exception of the <br />annual Construction Cost Index (CCI) adjustment. The 2017 SEP Update incorporated estimated TVTDF <br />revenues over a 10-year horizon. The SEP 2017 Update recommended allocating funding to all of <br />projects on List A and several projects on List B, at an approximate total of $50 million between FY16/17 <br />and FY 25/26. The TVTC SEP 2017 Update was adopted on January 23, 2017. <br />RECENT ACTIONS AND CURRENT SEP UPDATE <br />With half of the current project list no longer being eligible for funding as a result of projects being <br />completed or changes to the program, TVTC reviewed and selected additional projects to be considered <br />for funding from the TVTDF. This selection process resulted in a new list of projects to mitigate the <br />impacts of new development based on feasibility and stakeholder support. From this process, 16 projects <br />(“List C”) were identified to be consider for receive funding from the TVTDF. <br />In 2020, the 2020 TVTC Nexus Fee Update Study evaluated the remaining projects from List A and List <br />B, as well as the addition of 16 projects from List C. The analysis found that these projects would reduce <br />the congestion created by new development. The 2020 Nexus Study also determined the new maximum <br />fee needed to fund the improvement projects. The study was adopted on August 16, 2021. <br />This report constitutes the 2022 SEP Update and incorporates and builds upon the updated project <br />descriptions, funding programs, and progression of the TVTDF over the last six years, as well as the <br />project description of the new selected List C projects. As such, this report summarizes the status of the <br />38 projects listed in the 2022 Nexus Study, project prioritization, estimates revenues from the TVTDF over <br />a 10-year horizon, and provides a funding plan for the priority projects. The proposed 10-year funding <br />allocations and project disbursements were approved by the SEP Finance Subcommittee in April 4, 2022 <br />prior to full review and adoption by the TVTC Board in April 18, 2022. <br /> <br />1 Kimley-Horn. Validation Review of the 2008 Nexus Study. Nov 2015.