Laserfiche WebLink
TVTC Strategic Expenditure Plan 2022 Update │ Chapter 2: Project Description <br />Draft Final Report │ April 29, 2022 3 <br /> <br />CHAPTER 2: PROJECT DESCRIPTIONS <br />This section includes project summaries for each of the 38 projects included in the 2022 Nexus Study. <br />The summaries are based on information provided by member agencies who act as project sponsors and <br />include a project description, phasing details, funding sources, schedule, and status. The 38 projects are <br />presented in order based on their original list identifier, “A”, “B”, and “C”, representing the original 11 <br />projects, the 11 projects included in the 2008 Nexus Study, and the 16 projects included in the 2020 <br />Nexus Study, respectively. Detailed project descriptions are provided in Appendix A. <br />LIST A <br />• A-1 Interstate 580 (I-580)/Interstate 680 (I-680) Interchange (southbound to eastbound) <br />o Completed, therefore not considered for further funding <br />• A-2a State Route 84 (SR 84) Expressway (I-580 to I-680) <br />• A-2b SR 84/I-580 Interchange <br />• A-3 I-680 Auxiliary Lanes (Segment 2) <br />o Completed, therefore not considered for further funding <br />• A-4 West Dublin/Pleasanton Bay Area Rapid Transit (BART) Station <br />o Completed, therefore not considered for further funding <br />• A-5a I-580 Eastbound Auxiliary Lane <br />o Completed, therefore not considered for further funding <br />• A-5b I-580 High Occupancy Vehicle (HOV) Lane Westbound <br />o Completed, therefore not considered for further funding <br />• A-6 I-680 HOV Lanes, SR 84 to Top of Sunol Grade <br />o Southbound completed, northbound not considered for funding <br />• A-7 I-580/Foothill Road/San Ramon Road Interchange Modifications <br />o Completed, therefore not considered for further funding <br />• A-8 I-680/Alcosta Boulevard Interchange <br />o Completed, therefore not considered for further funding <br />• A-9a Crow Canyon Road Improvements Phase 1 <br />• A-9b Crow Canyon Road Improvements Phase 2 <br />• A-10a Vasco Road Safety Improvements Phase 1 <br />• A-10b Vasco Road Safety Improvements Phase 2 <br />• A-11 Express Bus/Bus Rapid Transit (BRT) – Phase 2 <br /> <br />LIST B <br />• B-1 I-580/I-680 Interchange (westbound to southbound) <br />• B-2 Fifth Eastbound Lane on I-580 from Santa Rita Road to Vasco Road <br />o Completed, therefore not considered for further funding <br />• B-3 I-580/First Street Interchange Modification <br />• B-4 I-580/Vasco Road Interchange Modification <br />• B-5 I-580/Greenville Road Interchange Modification <br />• B-6 Jack London Boulevard Extension <br />• B-7 El Charro Road Extension (Stoneridge Drive/Jack London Boulevard to Stanley Boulevard) <br />o Project incorporated into Project C-5 El Charro Widening and removed from project list <br />and no longer considered for funding