Laserfiche WebLink
r. <br /> LOS E during the PM peak hour under Cumulative Plus Project Conditions. Operations at <br /> this intersection can be improved to LOS C by optimizing the traffic signal timing to <br /> adjust for forecast changes in PM peak hour volumes. <br /> • Intersection 11:Hopyard Road/Stoneridge Drive—This intersection would operate at LOS F <br /> during the PM peak hour under Cumulative and Cumulative Plus Project <br /> conditions. Operations at the intersection can be improved to LOS E by optimizing traffic <br /> signal timing, but operations would not improve to within City of Pleasanton standards. <br /> Further mitigation was not identified due to the widening required and the presence of <br /> adjacent land uses abutting the intersection. <br /> • Intersection 13:Santa Rita Road/Stoneridge Drive—The addition of project generated <br /> traffic to Cumulative baseline conditions would result in this intersection degrading from <br /> LOS D to LOS E during the AM peak hour. During the PM peak hour,this intersection <br /> would operate at LOS E under both, Cumulative and Cumulative Plus Project conditions. <br /> Cumulative Plus Project AM peak hour operations at this intersection could be improved <br /> to LOS E by optimizing the traffic signal timing and modifying phasing. However, AM <br /> peak hour operations would not improve to within the City of Pleasanton's standard with <br /> the modifications. PM peak hour operations at this intersection can be improved to LOS <br /> D by optimizing the traffic signal timing to adjust for forecast changes in volumes. <br /> • Intersection 15:Hopyard Road/I-580 EB Ramp—This intersection operated at LOS F during <br /> the PM peak hour under Cumulative and Cumulative Plus Project conditions. Operations <br /> at this intersection can be improved to LOS C by optimizing the traffic signal timing to <br /> adjust for forecast changes in PM peak hour volumes. <br /> • Intersection 21:Santa Rita Road/I-580 EB Ramp/Pimlico Drive= During the PM peak hour, <br /> this intersection operates under LOS F conditions within Cumulative and Cumulative Plus <br /> Project scenarios.Operations at this intersection can be improved to LOS D by optimizing <br /> the traffic signal timing to adjust for forecast changes in PM peak hour volumes. <br /> • Intersection 24:Santa Rita RoadNalley Avenue—This intersection operates at LOS E <br /> during the PM peak hour under Cumulative and Cumulative Plus Project conditions. <br /> Operations at this intersection can be improved to LOS D by optimizing the traffic signal <br /> timing to adjust for forecast changes in PM peak hour volumes. <br /> • Intersection 26: Valley Avenue&Busch Road—The addition of project generated traffic to <br /> Cumulative baseline conditions would result in this intersection degrading to LOS E <br /> during the AM peak hour under Cumulative Plus Project Conditions. Operations at this <br /> intersection can be improved to LOS C by optimizing the traffic signal timing to adjust for <br /> forecast changes in AM peak hour volumes. <br /> • Intersection 27:Bernal Avenue/Valley Avenue/Stanley Boulevard—This intersection <br /> operates at LOS E during the PM peak hour under Cumulative and Cumulative Plus <br /> Project conditions. However,this intersection is an exempted gateway intersection. Signal <br /> timing optimization and/or adjustments would not achieve an acceptable level of <br />