Laserfiche WebLink
p <br /> intersection operations. Further widening which would be contrary to City of Pleasanton's <br /> other multimodal policies and goals cannot be applied at this intersection. <br /> • Intersection 28:Stanley Boulevard/El Charro Road—The addition of project generated <br /> traffic to Cumulative baseline conditions would result in this intersection degrading to <br /> LOS E during the AM peak hour under Cumulative Plus Project Conditions. However,this <br /> intersection is an exempted gateway intersection. Signal timing optimization and/or <br /> adjustments would not achieve an acceptable level of intersection operations. Further <br /> widening which would be contrary to City of Pleasanton's other multimodal policies and <br /> goals cannot be applied at this intersection. <br /> Conclusions <br /> The results of this transportation assessment indicate that operations of most critical intersections <br /> surrounding the Housing Element Update Project sites would not appreciably change with the <br /> addition of project generated traffic.The intersections that would deteriorate and fall below the <br /> City of Pleasanton's LOS standard with the Project either have feasible mitigations to improve <br /> their operations or have been identified as exempt intersections in the City of Pleasanton's <br /> General Plan. However, conditions at several critical intersections would deteriorate below the <br /> city's standards and not be mitigatable, particularly in the Cumulative scenario. <br /> The following intersections would experience an increase in delay of approximately 10 seconds <br /> with the inclusion of Project traffic under at least one of the scenarios analyzed. <br /> - 3 Foothill Road/Dublin Canyon Road/Canyon Way <br /> - 8 Stoneridge Drive/Stoneridge Mall Road <br /> - 13 Santa Rita Road/Stoneridge Drive <br /> - 23 Santa Rita Road/Old Santa Rita Road/Pickens Lane <br /> - 24 Santa Rita Road/Valley Avenue <br /> - 26 Valley Avenue/Busch Road <br /> - 28 Stanley Boulevard/EI Charro Road <br /> - 30 Sunol Boulevard/Valley Avenue/Junipero Street <br /> At many locations the increase in delay does not alter the total intersection LOS to an <br /> unacceptable level. Additionally,the addition of project traffic would accelerate the need to make <br /> intersection improvements identified in the City's Traffic Impact Fee Program. <br /> With the addition of traffic associated with the Housing Element sites to existing traffic levels, four <br /> study intersections would operate below the city's LOS standards.These conditions could be <br /> remedied through signal timing changes,the implementation of TIF improvements and traffic <br /> signalization. <br />