My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
21 ATTACHMENT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 12:48:43 PM
Creation date
12/16/2022 11:39:27 AM
Metadata
Fields
Template:
CITY CLERK
Document Relationships
21
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\122022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the Existing plus Approved Projects scenarios,four study intersections were found to operate <br /> below the city's LOS standards. Appropriate improvements were identified for some, but not all <br /> these locations.The construction of the El Charro Road extension project would improve <br /> operations at many locations in the Existing plus Approved Project scenario, particularly those <br /> along the Santa Rita Road corridor. <br /> In the Cumulative baseline scenario six study intersections were found to operate below the city's <br /> LOS standards. The addition of traffic associated with the Housing Element sites would result in <br /> an additional three failing intersections,with conditions degraded further at the six intersections <br /> operating poorly in the Cumulative baseline scenario. In all scenarios, the addition of project <br /> traffic would result in the exacerbation of existing queueing issues at some locations and the <br /> introduction of new queueing issues at additional intersections. <br /> Attachments: <br /> Attachment A: LOS Calculation Worksheets <br /> Attachment B: 95th Percentile Queue Summary <br /> Attachment C: Queue Calculation Worksheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.