My WebLink
|
Help
|
About
|
Sign Out
03 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
012623 SPECIAL
>
03 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 5:44:45 PM
Creation date
1/20/2023 5:17:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/26/2023
DESTRUCT DATE
15Y
Document Relationships
03
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2023\012623 SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Objective Design Standards for Multifamily Housing in R-M, C-C, and M-U Zoning Districts <br />City of Pleasanton - 26 - December 14, 2022January 5, 2023 <br />- DRAFT <br /> <br /> <br /> <br />B9.3 Development shall provide enclosures sized adequately or to meet minimum standards for <br />Pleasanton’s source separated recycling program for refuse. Buildings shall anticipate provisions <br />for at least one of the following options, with provision made for collecting and separating <br />different waste streams (non-recyclable waste, recyclable waste, and green/food waste) in all <br />cases: <br />a. Three (3) individualIndividual containers (carts) for each unit and a designated storage <br />location enclosed by low walls or building walls. or in single family homes when space is <br />not provided in a garage or carport, within a side or rear yard, behind an opaque fence <br />and gate or otherwise screened from the public street.. <br />b. Three (3) Individual containers (carts) for each unit and a designated clear storage area <br />within individual unit garages. <br />c. Opaque, roofed enclosure for refuse bins built of durable materials and designed to <br />harmonize with the proposed architecture. <br />d. Appropriately sized trash room to meet requirements for collection of different waste <br />streams inside the proposed building. <br />B9.4 If the applicant designatesproposes an interior trash room in which bins will remain until pickup, <br />or if they designate an exterior enclosure for staging refuse bins or carts, the applicant shall <br />provide a letter or other confirmation from the City’s solid waste franchisee confirming that the <br />required number of bins or carts can be collected from the proposed onsite staging area. <br /> <br />B9.5 If the applicant has an interior trash room which bins will remain in until pickup or if they <br />designate an exterior enclosure for staging refuse bins or carts, the applicant shall provide a letter <br />from the city’s solid waste franchisee confirming that the required number of bins or carts can be <br />collected from the proposed onsite staging area. <br /> <br />B9.5B9.6 Townhouse developments with dead end alleys shall provide a letter from the city’s solid <br />waste franchisee stating that either: <br />a. Individual carts can be collected adjacent to each garage; or <br />b. One or more exterior refuse enclosure(s) for cart collection located in accordance with <br />the preceding standard can be serviced. <br /> <br />Downtown Sites <br />B9.6B9.7 If utility providers require direct access from the street to utility rooms or closets, these <br />facilities shall be configured to occupy less than 25 percent of the length of any ground floor <br />façade facing a public right of way, open space or Paseo. <br /> <br /> <br /> <br />Design Guidelines: <br />All Sites <br />B8B9.a Projects that propose exterior gas or water meters for individual dwelling units should <br />locate meters in alleys adjacent to garage entries.
The URL can be used to link to this page
Your browser does not support the video tag.