Laserfiche WebLink
TO: MATT GRUBER <br /> SUBJECT: AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL CONSTRUCTION SUPPORT SERVICES <br /> construction for consideration by the City. If,after the observation, we are dissatisfied with the construction, <br /> we will prepare a written punch list of necessary corrective action on defective, unacceptable, and/or <br /> incomplete work. <br /> This task includes one(1) Final Acceptance observation.Additional observations to ensure punch-list items <br /> were completed satisfactorily can be provided under a contract augmentation on a time and materials basis or <br /> for an additional agreed-up fee. <br /> Assumptions: <br /> • The City will lead the construction administration/inspections;the Dudek Team will provide technical <br /> assistance to the City during the construction period as noted in our scope above. <br /> ■ Construction staking for trail alignment,features,and other site components is not included. <br /> ■ Geotechnical engineering assistance during construction is not included. <br /> ■ The Final Project Acceptance observation can be done in a 1-day site visit. <br /> Deliverables: <br /> ■ PDFs of preconstruction meeting agenda and field notes. <br /> ■ PDFs of memoranda addressing RFIs. <br /> ■ PDFs of memoranda addressing submittals. <br /> ■ PDFs of construction observations and recommendations field reports. <br /> ■ PDF of a field report addressing final acceptance punch list items or PDF of a written recommendation <br /> for a notice of provisional acceptance of the construction, if no punch list items are outstanding at <br /> time of final inspection. <br />