My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: MATT GRUBER <br /> SUBJECT: AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL CONSTRUCTION SUPPORT SERVICES <br /> construction for consideration by the City. If,after the observation, we are dissatisfied with the construction, <br /> we will prepare a written punch list of necessary corrective action on defective, unacceptable, and/or <br /> incomplete work. <br /> This task includes one(1) Final Acceptance observation.Additional observations to ensure punch-list items <br /> were completed satisfactorily can be provided under a contract augmentation on a time and materials basis or <br /> for an additional agreed-up fee. <br /> Assumptions: <br /> • The City will lead the construction administration/inspections;the Dudek Team will provide technical <br /> assistance to the City during the construction period as noted in our scope above. <br /> ■ Construction staking for trail alignment,features,and other site components is not included. <br /> ■ Geotechnical engineering assistance during construction is not included. <br /> ■ The Final Project Acceptance observation can be done in a 1-day site visit. <br /> Deliverables: <br /> ■ PDFs of preconstruction meeting agenda and field notes. <br /> ■ PDFs of memoranda addressing RFIs. <br /> ■ PDFs of memoranda addressing submittals. <br /> ■ PDFs of construction observations and recommendations field reports. <br /> ■ PDF of a field report addressing final acceptance punch list items or PDF of a written recommendation <br /> for a notice of provisional acceptance of the construction, if no punch list items are outstanding at <br /> time of final inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.