TO: MATT GRUBER <br /> SUBJECT:AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL CONSTRUCTION SUPPORT SERVICES <br /> ,SCOPEOF • ' <br /> TASK 9: AMM IMPLEMENTATION <br /> Task 9A: Project Initiation and Management <br /> A Dudek Senior Biologist will coordinate with the City and our subconsultant,Swaim Biological,to ensure our <br /> understanding of the project and the anticipated construction schedule and that AMMs are implemented as <br /> described in the project's Initial Study and Proposed Mitigated Negative Declaration.This will include periodic <br /> meetings, email and telephone communications,and budget tracking. <br /> Task 9B: Botanical Survey <br /> As required by the Special-Status Plants AMM, a Dudek botanist will survey the project site(i.e.,construction <br /> footprint plus 10-foot buffer)for special-status plants and other native herbaceous plants(i.e., native <br /> bunchgrasses and wildflowers)to be marked as Environmentally Sensitive Areas(ESAs)during final field fitting <br /> of trail improvements and alignments.The survey will be conducted in March or April 2023 to capture the <br /> typical blooming periods for the four target species: bent-flowered fiddleneck(March to June), Hospital Canyon <br /> larkspur(April to June),fragrant fritillary(February to April), and Diablo helianthella (March to June).After the <br /> survey,the botanist will summarize the survey findings including spatial data for all plant occurrences and <br /> vegetation patches(i.e., polygon features in GIS or CAD compatible file)in a brief email report to the City. <br /> Dudek will also conduct periodic monitoring of the ESAs throughout construction,which is assumed to require <br /> approximately 6 weeks. If no ESAs are identified, monitoring would not be required. <br /> Task 9C: Nesting Bird Survey <br /> As required by the Nesting Birds AMM,a Dudek wildlife biologist will conduct a survey for nesting birds prior to <br /> any trail construction occurring during the bird nesting season (March 1 to August 31). The survey will be <br /> conducted no more than 7 days prior to the start of work and include all suitable nesting habitat(i.e.,trees, <br /> shrubs,ground surfaces,etc.) in the construction footprint as well as adjacent habitat in which nesting pairs <br /> could be disturbed(e.g.,visual scan of trees within 250 feet for nesting raptors). <br /> No further work would be required if no nests are found during the survey. If the biologist identifies an active <br /> nest sufficiently close to the work area to be disturbed by construction,they will prescribe an appropriately <br /> sized buffer around the nest(s) in which no work would occur until the young have fledged or the nest is no <br /> longer active,whichever occurs first.Active nest locations will be flagged in the field and GPS coordinates for <br /> each nest will be recorded using a GPS.The biologist will summarize the results of the survey(including <br /> informal map of active nests)and associated buffer zone(s) in a brief email report to the City. <br /> Should construction pause for 14 or more days,an additional nesting bird survey would be required. Dudek <br /> will provide a supplement scope of work and budget if this is necessary. <br /> Task 9D: Alameda Whipsnake Daily Construction Monitoring <br /> As required by the Alameda Whipsnake(AWS)AMM, Dudek's subconsultant Swaim Biological,a local <br /> biological consulting firm that has extensive experience surveying and monitoring for AWS,will conduct daily <br /> construction monitoring during ground-disturbance activities(which are assumed to require no more than 20 <br /> days)and implement the AWS AMM for this project.Although biologists conducting this work would have the <br /> necessary experience and permits to capture and handle any AWS found during construction,they would not <br /> be able to do so for this project since it would constitute take under FESA and CESA. In the likely scenario that <br /> `rr <br /> 1 <br />