Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> D. Prohibit the attachment of wires,signs and ropes to any heritage tree. <br /> E. Design utility services and irrigation lines to be located outside of the dripline when feasible. <br /> F. Retain the services of a certified consulting arborist for periodic monitoring of the project site and <br /> the health of those trees to be preserved. The certified consulting arborist shall be present <br /> whenever activities occur which pose a potential threat to the health of the trees to be preserved <br /> (for example,when work occurs within the dripline of trees to be preserved). <br /> G. The director shall be notified of any damage that occurs to a tree during construction so that proper <br /> treatment may be administered. <br /> Impact Discussion <br /> a) Would the project have a substantial adverse effect, either directly or through habitat <br /> modifications,on anyspecies identified as a candidate,sensitive,orspecial status species in local <br /> or regional plans,policies,or regulations,or by the California Department of Fish and Game or U.S. <br /> Fish and Wildlife Service? <br /> Special-Status Plants <br /> The project would be constructed in coast live oak woodland and scrub communities that contain <br /> suitable habitat for four California Rare Plant Rank 113 species: bent-flowered fiddleneck <br /> (Amsinckia lunaris), Hospital Canyon larkspur (Delphinium californicum ssp. interius), fragrant <br /> fritillary(Fritillaria liliacea), and Diablo helianthella (Helianthella castanea).Although there are no <br /> known occurrences of these species near the project site, and habitat suitability adjacent to <br /> existing informal trails is low due to the prevalence of non-native species (e.g., vetch, non-native <br /> annual grasses)and disturbance from unofficial mountain bike use,their presence cannot be ruled <br /> out without a focused survey by a qualified botanist, which would be conducted as part of the <br /> project under the Special Status Plants AMM that is incorporated in the project design and <br /> construction methodology. <br /> Clearing and grubbing of shrubs and ground vegetation and grading could result in the removal of <br /> special-status plant occurrences if any are found during the botanical survey required under the <br /> Special Status Plants AMM and cannot be avoided by project construction.Such direct impacts on <br /> special-status plants would be a significant impact before mitigation because the removal of <br /> undocumented occurrences would further contribute to statewide declines. Mitigation Measure <br /> (MM) 13I0-1 requires that the City provide compensatory mitigation for any effects to special status <br /> plants through seed/propagule collection, planting, and conducting adaptive management, <br /> maintenance and monitoring for 5 years to attain identified species-specific success criteria. <br /> Implementation of MM 13I0-1 would reduce this impact to less than significant.Therefore, impacts <br /> would be less than significant with mitigation incorporated. <br /> 12956 <br /> DUDEK 42 April 2022 <br />