My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Special-Status Wildlife <br /> California red-legged frog <br /> The project site does not support aquatic breedingor non-breeding habitatfor California red-legged <br /> frog but may be used as upland or dispersal habitat by any individuals breeding in the ridgetop <br /> ponds 0.9 to 1.1 miles to the north during the rainy season.Any frogs dispersing through the site <br /> would not be expected to remain for extended periods due to the lack of aquatic habitat.In addition, <br /> project construction would occur outside the rainy season when frogs would be on the move. <br /> Vegetation clearing and ground disturbance would therefore not result in injury or mortality of <br /> individual red-legged frogs. Impacts to potential California red-legged frog movement habitat from <br /> new trail construction would be offset by the decommissioning and restoration of existing <br /> unauthorized mountain bike trails. Therefore, impacts on California red-legged frog movement <br /> habitat would be less than significant. <br /> Alameda Whipsnake <br /> The project would be constructed in a coast live oak woodland and scrub mosaic suitable for <br /> Alameda whipsnake, although it has not been observed on the site to date by City staff. Clearing <br /> and grubbing of shrubs and ground vegetation would directly impact potential Alameda whipsnake <br /> movement habitat but would not result in injury or mortality of individual whipsnakes because of <br /> the Alameda Whipsnake AMM that has been incorporated in the project design and implementation <br /> methodology. <br /> Hiking and biking trails in and near occupied Alameda whipsnake habitat do not cause as much <br /> mortality as motor vehicles, and Alameda whipsnakes can persist in areas bisected by hiking and <br /> bikingtrails;however, heavily trafficked and high-density trails can result in occasional disturbance <br /> and mortality of Alameda whipsnake (USFWS 2011). Miller and Alvarez (2016) reviewed 356 <br /> reported observations of Alameda whipsnake and found that 25% of these observations were in <br /> open habitat such as roads,trails,and parking areas.At least 13 of the observations in such areas <br /> included specimens that apparently succumbed to human-related mortality, including at least one <br /> killed by a mountain bike. <br /> Mortality and disturbance of Alameda whipsnakes, if present,from future mountain bike use of the <br /> trail system would be an indirect impact of the project.Any Alameda whipsnakes currently occurring <br /> on or near the project site would be exposed to existing mountain bike traffic on the numerous <br /> informal dirt trails that permeate this portion of Augustin Bernal Community Park.The intent of the <br /> project is to formalize mountain bike use in the parkto eliminate,or at least minimize,unauthorized <br /> use, which the City acknowledges as a current adverse effect on native vegetation and wildlife <br /> habitat in the park.Although the project would not entirely remove the risk of Alameda whipsnakes <br /> being harassed or killed by mountain bikes, it would not expand mountain bike use into other parts <br /> of the park,and would result in a net reduction in the total linear feet of trails within the park.The <br /> proposed trail would largely replace an existing unofficial, user-created trail.The total length of the <br /> new trail would be approximately 3,700 linear feet,of which approximately 1,070 linear feet would <br /> require new construction and 2,630 linear feet would replace the existing trail surface. In addition <br /> approximately 4,300 linear feet of other existing unofficial, user-created trails would be <br /> 12956 <br /> DUDEK 43 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.