My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> decommissioned. Therefore, the project is not expected to substantially change Alameda <br /> whipsnake exposure to human recreational stressors (e.g., mountain bike traffic) from existing <br /> conditions,and indirect impacts from future use of the trail would be less than significant. <br /> In summary,the project has been designed to minimize ground disturbance of oak woodland and <br /> would implement the Alameda Whipsnake AMM to avoid injury and mortality of individual Alameda <br /> whipsnakes.Decommissioning and restoration of existing unofficial user-created trails would offset <br /> direct impacts to existing oak woodland movement habitat and also reduce future mortality risk for <br /> any whipsnakes currently movingthrough the site by confining mountain bike traffic to a single trail <br /> system. The project would not impact any core scrub/shrub habitat for Alameda whipsnake. <br /> Therefore, impacts would be less than significant. <br /> Special-Status Birds <br /> The project would be constructed in coast live oak woodland and scrub that provides nesting <br /> habitatfor many bird species, includingoak titmouse,Cooper's hawk(Accipitercooperi),and white- <br /> tailed kite. If conducted during the nesting season (March 1 through August 31),trimming of tree <br /> branches and moving downed tree branches or trunks could directly impact active oak titmouse <br /> nests,which nest in natural tree cavities.Direct impacts on Cooper's hawk or white-tailed kite nests <br /> are not expected because no trees would be removed, but construction-generated noise could <br /> cause indirect impacts if adults nesting within auditory range of construction perceive such <br /> disturbance as a threat and abandon eggs or recently hatched nestlings. The project would <br /> implement the Nesting Bird AMM to avoid such impacts, however,and there would therefore be no <br /> impact on native bird nests. <br /> b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive <br /> natural community identified in local or regional plans, policies, regulations, or by the California <br /> Department of Fish and Game or U.S. Fish and Wildlife Service? <br /> No riparian habitat or other natural communities considered sensitive by CDFW(2020)are present <br /> on the project site.Therefore,the project would have no impact on sensitive natural communities. <br /> C) Would the project have a substantial adverse effect on state or federally protected wetlands <br /> (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, <br /> hydrological interruption,or other means? <br /> No state or federally protected wetlands are present on the project site. Therefore, the project <br /> would have no impact on such resources. <br /> d) Would the project interfere substantially with the movement of any native resident or migratory <br /> fish or wildlife species or with established native resident or migratory wildlife corridors,or impede <br /> the use of native wildlife nursery sites? <br /> The project would occur in a critical habitat linkage identified as regionally important for wildlife <br /> movement and habitat connectivity(Penrod et al. 2013) but would not interfere substantially with <br /> wildlife movement through this linkage.The project would not create any new barriers(e.g., roads, <br /> structures)that would permanently alter existing wildlife movement patterns or introduce mountain <br /> 12956 <br /> DUDEK 44 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.